GCB-Final | 9/23/2015 | 9/23/2015 | 9/23/2015 | P | PASS |
Jim Sly
|
|
|
Nick ###-#### - requested 1/2hr call ahead
|
GCB-Final | 9/22/2015 | 9/22/2015 | 9/22/2015 | P | FAIL |
Mike Jordan
|
|
|
Nick ###-#### - requested 1/2hr call ahead. iNstall the vertical grab bar in restroom and provide compliant landing outside rear exit.
|
FIRE-Final Inspection | 9/21/2015 | 9/22/2015 | 9/22/2015 | A | PASS |
Katie Marron
|
|
|
Previous correction items verified. Address posted was wrong, contractor to fix asap. Life Safety pass.
|
FIRE-Final Inspection | 9/18/2015 | 9/18/2015 | 9/18/2015 | P | FAIL |
Troy Cobbley
|
|
|
Provide verification the double doors can be deleted out of the storage area, provide one additional fire extinguisher in shop, provide single action hardware on the south door, repair the exit discharge light at the main exit, provide address and sticker at the main exit.
|
GCB-Ceiling Grid | 9/8/2015 | 9/8/2015 | 9/8/2015 | P | PASS |
Dave Hannah
|
|
|
Nick ###-####
|
GCB-Energy | 8/19/2015 | 8/19/2015 | 8/19/2015 | P | PASS |
Dave Hannah
|
|
|
Nick ###-#### - requested 30min call ahead
|
GCB-Framing | 8/19/2015 | 8/19/2015 | 8/19/2015 | P | PASS |
Dave Hannah
|
|
|
Nick ###-#### - requested 30min call ahead
|
GCB-Shearwall | 8/14/2015 | 8/14/2015 | 8/14/2015 | P | PASS |
Dave Hannah
|
|
|
Nick ###-#### - ROOF SHEAR INSP.
|
GCB-Shearwall | 8/10/2015 | 8/11/2015 | 8/11/2015 | P | PART |
Jim Sly
|
|
|
Nick ###-#### Insp of three brace panels at North wall ......including Hold downs, Titen Screws and nailing...OK. As per Engineers direction, I observed new raked shear wall locacted at center of building above CMU wall. Wall sheathed and nailed at 6/12. Also glue lam block , 4 hold downs (mounted horizontally) with threaded rod and nuts completed to tie the beam from North building (East side) to South building. Approx 40 foot strap installed to connect beam at North bldg to South bldg. Strap nailed into 2x8 ....full length.
|
GCB-Footing | 8/3/2015 | 8/4/2015 | 8/5/2015 | P | PASS |
Dave Hannah
|
|
|
Nick ###-#### ok to pour int side
|
Plan assigned to (CDM) | 5/8/2015 | 5/8/2015 | 7/6/2015 | | DONE |
Carl D Madsen
|
|
|
first review completed
|
Routing - PLAN CHECK | 7/6/2015 | | 7/6/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2015 | | DONE |
|
|
|
|
Issue and Courier | | | 7/6/2015 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 6/29/2015 | | DONE |
|
|
|
resubmittals received 3 sets of sheet G0.02, A2.01, & E2.1-took to Carl M
|
Routing - PLAN CHECK | 3/30/2015 | | 6/23/2015 | | FAIL |
Carl D Madsen
|
|
|
Expires June 15th
|
Plan resubmittals received | | | 6/22/2015 | | DONE |
|
|
|
resubmittals received 3 sets of sheets G0.01, G0.02, A2.01, A2.02, M1.00, M2.00, M3.00, E0.0, E.01, E0.2, E2.1, E3.0 & 1 packet of special inspections-took to Casrl M
|
Plan assigned to (SRZ) | | 3/17/2015 | 5/8/2015 | | DEFR |
Sam Zahorka
|
|
|
1st review completed
|
Routing - FIRE | 3/26/2015 | | 3/30/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
1st review completed | | | 3/30/2015 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - PLAN CHECK | 4/23/2015 | | 3/26/2015 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - Mechanical Review | 3/19/2015 | | 3/23/2015 | | PASS |
Troy James
|
|
|
no mechanical
|
Routing - Public Works | 3/17/2015 | 3/17/2015 | 3/19/2015 | | PASS |
Beverly Mountain
|
|
|
|
Application received | | | 3/16/2015 | | DONE |
|
|
|
via Garden City Web Service
|