GCB-Final | 2/9/2016 | 2/10/2016 | 2/10/2016 | P | PASS |
Jim Sly
|
|
|
TJ ###-####
|
FIRE-Final Inspection | 2/4/2016 | 2/5/2016 | 2/5/2016 | P | PASS |
Katie Marron
|
|
|
Previous correction items completed satisfactory. Life safety pass.
|
FIRE-Final Inspection | 1/11/2016 | 1/11/2016 | 1/11/2016 | P | FAIL |
Jim Page
|
|
|
Northwest exit, building B on city approved drawing, needs to have exit sign/emergency lighting serviced, egress/exit did not stay illuminated when power was isolated. Thumburn deadbolt on same door will be changed to double key deadbolt and associated signage installed. Exit discharge landings for building A need to have emergency egress illumination installed. SIngle action door hardware needs to be installed on the west exit for building A as well as a double key deadbolt installed on east entrance with associated signage.
|
FIRE-Final Inspection | 1/4/2016 | 1/5/2016 | 1/5/2016 | A | FAIL |
Troy Cobbley
|
|
|
Need the city approved drawings and notes. TJ and I went over life safety requirements. I looks like the biggest issue will be door haredware.
|
Plan assigned to (CDM) | 5/14/2015 | 5/14/2015 | 6/9/2015 | | DONE |
Carl D Madsen
|
|
|
|
Plan assigned to (CDM) | 5/8/2015 | 5/8/2015 | 6/9/2015 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 5/21/2015 | | 5/21/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing - Mechanical Review | 5/21/2015 | | 5/21/2015 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/21/2015 | | DONE |
|
|
|
|
Issue and Courier | | | 5/21/2015 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/14/2015 | | DONE |
|
|
|
resubmittals received 3 sheets of A2-took to Carl M
|
Plan assigned to (SRZ) | | 4/6/2015 | 5/8/2015 | | DEFR |
Sam Zahorka
|
|
|
Pending Mechanical to pass.
|
Routing - FIRE | 4/20/2015 | 4/20/2015 | 4/30/2015 | | PASS |
Scott Arellano
|
|
|
Attached report to plans.
|
Routing - PLAN CHECK | 4/6/2015 | | 4/20/2015 | | PASS |
Sam Zahorka
|
|
|
|
Routing - Public Works | 4/6/2015 | 4/6/2015 | 4/6/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Mechanical Review | 4/6/2015 | | 4/6/2015 | | FAIL |
Troy James
|
|
|
emailed correction to applicant
|
Application received | | | 4/3/2015 | | DONE |
|
|
|
via Garden City Web Service
|