Permit Information
Permit NumberGCB15-00040
StatusFinaled
Name Companions Dog Resort
Site Address 106 W 39TH ST
Project NameBLD2015-00040
Customer Number 
ePlanReviewNo
Description
Companions Dog Resort - Remodel to legally convert two existing residential dwelling buildings into a commercial use as a business occupancy. Building 'A' is 975 square feet and Building 'B' is 1,038 square feet. Work to include: Enlarge the main exterior egress door opening with a new door and hardware; replace the existing door and add a new vertical grab bar in the existing public restroom; provide new accessible parking signage; replace the existing entrance door threshold with 1/2" high accessible threshold; provide an accessible point of service counter at the reception desk; and all other work per the approved plans, attached plan review report, and adopted codes. Alterations for accessibility shall be per the ICC/ANSI A117.1-2009. This building is not fire sprinklered. **SRZ** - PWU2015-00027
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final2/9/20162/10/20162/10/2016PPASS
DetailsJim Sly
TJ ###-####
FIRE-Final Inspection2/4/20162/5/20162/5/2016PPASS
DetailsKatie Marron
Previous correction items completed satisfactory. Life safety pass.
FIRE-Final Inspection1/11/20161/11/20161/11/2016PFAIL
DetailsJim Page
Northwest exit, building B on city approved drawing, needs to have exit sign/emergency lighting serviced, egress/exit did not stay illuminated when power was isolated. Thumburn deadbolt on same door will be changed to double key deadbolt and associated signage installed. Exit discharge landings for building A need to have emergency egress illumination installed. SIngle action door hardware needs to be installed on the west exit for building A as well as a double key deadbolt installed on east entrance with associated signage.
FIRE-Final Inspection1/4/20161/5/20161/5/2016AFAIL
DetailsTroy Cobbley
Need the city approved drawings and notes. TJ and I went over life safety requirements. I looks like the biggest issue will be door haredware.
Plan assigned to (CDM)5/14/20155/14/20156/9/2015 DONE
DetailsCarl D Madsen
Plan assigned to (CDM)5/8/20155/8/20156/9/2015 DONE
DetailsCarl D Madsen
Routing - PLAN CHECK5/21/2015 5/21/2015 PASS
DetailsCarl D Madsen
Routing - Mechanical Review5/21/2015 5/21/2015 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  5/21/2015 DONE
Issue and Courier  5/21/2015 DONE
Plan resubmittals received  5/14/2015 DONE
resubmittals received 3 sheets of A2-took to Carl M
Plan assigned to (SRZ) 4/6/20155/8/2015 DEFR
DetailsSam Zahorka
Pending Mechanical to pass.
Routing - FIRE4/20/20154/20/20154/30/2015 PASS
DetailsScott Arellano
Attached report to plans.
Routing - PLAN CHECK4/6/2015 4/20/2015 PASS
DetailsSam Zahorka
Routing - Public Works4/6/20154/6/20154/6/2015 PASS
DetailsBeverly Mountain
Routing - Mechanical Review4/6/2015 4/6/2015 FAIL
DetailsTroy James
emailed correction to applicant
Application received  4/3/2015 DONE
via Garden City Web Service