Permit Information
Permit NumberGCB15-00063
StatusFinaled
Name Telaya Wine Co.
Site Address 2900 W CHINDEN BLVD
Project NameBLD2015-00063
Customer Number 
ePlanReviewNo
Description
(Telaya Winery) For the construction of a new 11,138 sq. ft. two story (8,713 first, 2,425 second) winery with associated offices and tasting room areas with work to include construction of the new building including all interior improvements and related site work. The first story consists of two tasting rooms, an office, restrooms and a production area. The second story has two offices and a small club room/tasting area. There are two mezzanines in the production area (315 sq. ft. and 800 sq. ft.). This building is fully fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final2/16/20162/17/20162/17/2016APASS
DetailsDave Hannah
John ###-####
GCB-Final1/25/20161/27/20161/27/2016APART
DetailsDave Hannah
John ###-#### - final for C of O ok for temp occ
FIRE-Final Inspection1/25/20161/26/20161/26/2016PPASS
DetailsKatie Marron
Fire Life Safety Pass. Verified all exterior egress lighting, door hardware, and sprinkler escutcheons/ceiling tiles.

Extinguishers missing from mezzanines in production area. Contractor receiving two this afternoon. To be verified by Building Inspector.

Occupant Load signs present, not hung.
GCB-Courtesy1/20/20161/20/20161/20/2016PPASS
DetailsDave Hannah
John ###-#### - requested Dave
FIRE-Final Inspection1/14/20161/15/20161/15/2016APART
DetailsKatie Marron
Temporary Occupancy Ok for first floor business area. No general public allowed.

Verified exit hardware and fire extinguishers in this temporary occ. area. Verified exit signs, emergency lighting and ceiling tiles are in place throughout bldg.

At final will need to verify outside egress lighting, Occupant load sign, fire extinguishers in all other area, all remaining door hardware.
GCB-Final1/14/20161/14/20161/14/2016PPART
DetailsDave Hannah
John ###-#### - Final for Temp C of O Only
ok for temp occ but no general public owner and staff only
GCB-Ceiling Grid1/12/20161/12/20161/12/2016PPASS
DetailsJim Sly
John ###-####
Grid OK.
GCB-Courtesy1/6/20161/6/20161/7/2016PDONE
DetailsDave Hannah
John ###-#### - requested call ahead
FIRE-Conference1/6/20161/6/20161/6/2016PDONE
DetailsTroy Cobbley
John Chehey and I went over life safety requierments for a temporary occupancy for the "Tasting" area. I deferred him to Scott Arellano for the actual temporary request. I noted that the building address of 2900 chinden is incorrect on the computer as well.
FIRE-Sprinkler Rough-in12/31/201512/31/201512/31/2015APASS
All hard lid area ok to cover EXCEPT West stairway.
GCB-Energy12/21/201512/21/201512/21/2015PPASS
DetailsDave Hannah
John ###-####
GCB-Energy12/17/201512/18/201512/18/2015PPART
DetailsDave Hannah
John ###-####second floor offices ok to cover
GCB-Energy11/30/201512/1/201512/2/2015PPART
DetailsDave Hannah
John ###-#### ok to cover south area of bldg
GCB-Framing11/25/201511/30/201511/30/2015APASS
DetailsMike Jordan
John ###-####. interior and exterior shear walls, 1st floor ok, all holdowns installed. ok to insulate.
GCB-Shearwall11/17/201511/18/201511/18/2015APART
DetailsDave Hannah
John ###-#### ext sheeting and nailing ok butneeds to install holddowns
GCB-Framing11/3/201511/4/201511/4/2015APART
DetailsMike Jordan
John ###-####. Work in progress on structural steel welding. Pending special inspection approval prior to cover.
GCB-Fndatn/slab ins/fld vent9/9/20159/11/20159/11/2015APASS
DetailsPhil Shearer
John ###-####. Pending MTI inspection
GCB-Footing9/1/20159/2/20159/2/2015APART
DetailsPhil Shearer
Line D footing stem wall line 1 Pending MTI inspection
GCB-Fndatn/slab ins/fld vent8/24/20158/25/20158/25/2015APART
DetailsJim Sly
John ###-####
All walls except .......S. wall ....E. end. Wall that parallels Green Belt. Center wall. OK pending M T I special inspections, tests and approvals.
GCB-Footing8/5/20158/5/20158/6/2015PPART
DetailsJim Sly
Jordan ###-####
Perimeter and 2 column pads OK pending MTI special inspection, tests and approvals.
Issue and Courier  7/13/2015 DONE
Plan assigned to (CDM) 5/14/20157/12/2015 DONE
DetailsCarl D Madsen
First review completed
Routing - PLAN CHECK6/26/2015 7/12/2015 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  7/12/2015 DONE
Routing Off Site - STRUCTURAL7/6/2015 7/8/2015 PASS
DetailsCarl D Madsen
resubmittals dated 7/2/15
Received approval letter on 7/8/15
Plan resubmittals received  7/2/2015 DONE
resubmittals received 3 of each sheets S0.2, S2.0, S8.1, S9.1, S9.2, S9.3-engineering calcs & 1 response letter-took to Carl M
Plan resubmittals received  6/30/2015 DONE
resubmittals received 3 sets of sheet A2.1, A6.0, A9.0 and a response letter-took to carl M
Routing - FIRE6/25/20156/25/20156/26/2015 PASS
DetailsKatie Marron
Comments attached to plans
Plan resubmittals received  6/26/2015 DONE
resubmittals-received 3 sheets of F2.00 & 1 transmittal letter-took to Carl M
Routing - PLAN CHECK6/12/2015 6/25/2015 FAIL
DetailsCarl D Madsen
Accessible route is not adequately addressed.
Plan resubmittals received  6/25/2015 DONE
resubmittals recieved 3 sets of sheet A2.1 & F2.00-1 response letter - Took to Carl M
Routing Off Site - STRUCTURAL6/2/2015 6/25/2015 FAIL
DetailsCarl D Madsen
Forwarded comments to Larson Architects
Plan resubmittals received  6/24/2015 DONE
Resubmittals received 3 of each sheet A0.0, C1.20,A0.21, A2.1, A2.2, A2.3, A3.1, A6.0, A6.3, A6.5, A7.0, A9.0,A9.1, AS5.0, AS6.0, E0.1, E2.1L, E2.2L & 1 response packet-took to Carl M
Routing - FIRE6/10/20155/14/20156/12/2015 FAIL
DetailsKatie Marron
Comments attached to plan and emailed to architect
1st review completed  6/12/2015 FAIL
Failed Fire and Plan Check
Routing - Plumbing Review6/8/2015 6/10/2015 PASS
DetailsDaryl Spivey
May require additional backflow protection on installed equipment.
Routing - PLAN CHECK5/21/2015 6/8/2015 FAIL
DetailsCarl D Madsen
E-Mailed Larson architects and Garden City. 6-8-2015
Plan resubmittals received  6/2/2015 DONE
received thge 3rd set of plans for outside engineering plus 3 struc cals, 2 geotech reports and a cover sheet-took to Carl M
Routing - Mechanical Review5/18/2015 5/21/2015 PASS
DetailsTroy James
Routing - Public Works5/14/20155/14/20155/18/2015 PASS
DetailsBeverly Mountain
Application received  5/12/2015 DONE
via Garden City Web Service