Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberGCB15-00080
StatusFinaled
Name CATHERINE SEWELL
Site Address 304 E 42ND
Project NameBLD2015-00081
Customer Number 
ePlanReviewNo
Description
(WILDFLOUR BAKERY) **PLAN MODIFICATION TO CHANGE THE BACK LOADING AREA COVER WITH AN AWNING SYSTEM AND REMOVE THE CMU WING WALLS. Permit for the construction of a new 2,287 sq. ft. building for a new bakery. The building is wood framed construction with a class B roofing material. Work to include plumbing, electrical, mechanical and related site improvements. This building is not fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final1/12/20161/12/20161/12/2016PPASS
DetailsJim Sly
Larry ###-####
FIRE-Final Inspection1/12/20161/12/20161/12/2016PPASS
DetailsJim Page
Previously noted items addressed, spoke with Katie Marron, fire plan reviewer about the exit sign in question, exit sign is allowed to be deleted. Life fire safety passed/complete
FIRE-Final Inspection1/11/20161/11/20161/11/2016PFAIL
DetailsJim Page
City approved drawings show an exit sign on the east exit, no exit sign was installed. Exit sign needs to be installed or documentation approved by the city allowing removal of exit light.
GCB-Energy11/9/201511/10/201511/10/2015APASS
DetailsDave Hannah
Larry ###-####
GCB-Fire Wall11/3/201511/4/201511/4/2015APASS
DetailsMike Jordan
Larry ###-####. North parapet wall and top plate penetrations ok.
GCB-Framing10/29/201510/30/201510/30/2015PPART
DetailsJim Sly
Larry ###-####
Need to Extend rock to roof deck at East wall interior side.......Need to Firestop all top plate penitrations.....then call for insp. Provide approved plan for exterior cover at rear of bldg.
Routing - PLAN CHECK10/27/2015 10/27/2015 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  10/27/2015 DONE
Issue and Courier  10/27/2015 DONE
Plan resubmittals received  10/26/2015 DONE
resubmittals received 3 of sheet SK-001, 1 conver sheet & 1 rear canopy design calcs-took to Carl M
Routing - PLAN CHECK10/19/2015 10/19/2015 FAIL
DetailsCarl D Madsen
See the attached plan review report.
Plan resubmittals received  10/15/2015 DONE
resubmittals received 3 sheets of DWG #SK-001a transmittal sheet & comments-took to Carl M
GCB-Courtesy10/8/201510/9/201510/9/2015ADONE
DetailsJim Sly
Larry ###-#### - discuss firewall - requested call ahead
GCB-Fire Wall10/6/201510/6/201510/6/2015PPART
DetailsJim Sly
Larry ###-#### - exterior firewall
Ext walls OK except for 5/8 rock on facing of pop out walls ......W. side of Bldg. Architect to address covered loading area not per approved plan. Talked to Larry about this. Soffits not double rocked yet.
GCB-Shearwall9/28/20159/28/20159/28/2015PPASS
DetailsJim Sly
Larry ###-####
GCB-Shearwall9/25/20159/28/20159/28/2015ANR
DetailsJim Sly
Larry ###-####
Need to complete blocking/nailing.
GCB-Fndatn/slab ins/fld vent9/2/20159/2/20159/2/2015PPASS
DetailsDave Hannah
Chris ###-####
GCB-Footing8/31/20159/1/20159/1/2015APASS
DetailsJim Sly
Shawn ###-#### - requested 11:30a.m. insp.
Plan assigned to (CDM)6/26/20156/26/20158/17/2015 DONE
DetailsCarl D Madsen
First review completed.
Routing - PLAN CHECK8/3/2015 8/7/2015 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  8/7/2015 DONE
Issue and Courier  8/7/2015 DONE
Plan resubmittals received  8/6/2015 DONE
resubmittal received 4 sheets of M2.0, 1 response letter took to Carl M
Routing - Mechanical Review8/3/2015 8/3/2015 PASS
DetailsTroy James
Plan resubmittals received  7/28/2015 DONE
resubmittlas received 4 sets of sheet G0.1,G0.3, A1.0, A2.0, A2.1, A2.2, A3.0, A5.0, A5.1, A6.1, A9.0, A2.0, M2.0, M3.0, P1.0, P2.0-trasmittla sheet1 set of cals for cooling & heating-took to Carl M
Routing - FIRE7/19/20156/26/20157/20/2015 PASS
DetailsScott Arellano
Comments attached to plans
Routing - Plumbing Review7/16/2015 7/20/2015 PASS
DetailsDaryl Spivey
Per plan and ISPC.
1st review completed  7/20/2015 DONE
Routing - PLAN CHECK  7/19/2015 FAIL
DetailsCarl D Madsen
Routing - Mechanical Review  7/17/2015 FAIL
DetailsTroy James
talked engineer on the phone
Application received  6/24/2015 DONE
via Garden City Web Service
Routing - Public Works6/26/20156/26/2015   
DetailsBeverly Mountain