Permit Information
Permit NumberGCB15-00090
StatusFinaled
Name Larson Architects
Site Address 5024 W CHINDEN
Project NameBLD2015-00091
Customer Number 
ePlanReviewNo
Description
(WEST VET) """PLAN MODIFICATION TO RELOCATE THE MEDICAL GAS ROOM TO THE NORTH EXTERIOR WALL OF THE BUILDING """ ""PLAN MODIFICATION FOR MINOR INTERIOR CHANGES ICLUDING MILLWORK AND SOME ROOM RECONFIGURATIONS"" Permit for the construction of a new 32,170 sq. ft. two story building with 16,186 sq. ft. on the first story and 15,984 sq. ft. on the second story. The first story includes animal care and reception areas with the second story consisting of office, animal care, employee locker room an A-3 training room and two sleeping units. The building will be fully fire sprinklered for allowable area increase and is also required due to the inclusion of sleeping units. The building is to be equipped with a voice alarm system to allow for a reduction in the exit width from the second story per section 1005 2012 IBC. All work per the approved plans ,any notation, attached engineering and the attached plan review report. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan assigned to (CDM)9/8/20169/8/201610/14/2017 DONE
DetailsCarl D Madsen
GCB-Final1/23/20171/24/20171/24/2017APASS
DetailsJim Storey
Chris ###-#### - FOR FINAL C OF O - call ahead requested
FIRE-Final Inspection11/28/201611/28/201611/28/2016PPASS
DetailsKatie Marron
Fire Life safety Pass.
GCB-Final11/23/201611/28/201611/28/2016APART
DetailsJim Storey
Chrius ###-####-please call prior to meet for access back exit encloser hardware on one gate for single function egrees/ r occ pending completion
FIRE-Hydro test above ground11/28/201611/28/201611/28/2016PCANC
DetailsDave Hannah
Call prior to going Phone #: 2831426 >> Inspection requested via mobile web by Chris Fermin Inspection cancelled via mobile web on Monday, November 28, 2016.
FIRE-Conference11/22/201611/22/201611/22/2016ADONE
DetailsKatie Marron
Emergency lighting/exit signs were tested satisfactory at Alarm Final (11/22/16); electrician was on site and ready.
GCB-Ceiling Grid11/14/201611/15/201611/15/2016APASS
DetailsMike Jordan
Chris ###-#### - requests call ahead. Grid ceiling, 2nd. floor apartment ok.
GCB-Courtesy11/1/201611/2/201611/2/2016APASS
DetailsDave Hannah
Chris ###-#### - STRUCTURAL CONFERENCE ONLY - requests call ahead
GCB-Fire Wall10/16/201610/14/201610/17/2016ACANC
DetailsDave Hannah
THE REQUEST IS FOR A STRCTURAL GRID FOR THE S. HALF OF THE 1ST FLOOR
PLEASE CALL WHEN IN ROUTE
GCB-Ceiling Grid10/13/201610/14/201610/14/2016APASS
DetailsMike Jordan
###-####-please call when in route-inspection for grid in south half of 1st floor
GCB-Ceiling Grid10/4/201610/5/201610/5/2016APASS
DetailsDave Hannah
Chris ###-#### - requests call ahead - N. 1/2 1st Floor
GCB-Fire Wall9/29/20169/30/20169/30/2016APASS
DetailsDave Hannah
Chris ###-#### - requests call ahead sheetrock under stairs ok
GCB-Fire Wall9/27/20169/27/20169/27/2016PPASS
DetailsMike Jordan
Chris ###-#### - requests call ahead. Interior steel stud furred wall in residence portion, 2nd. floor.
GCB-Ceiling Grid9/16/20169/16/20169/19/2016PPASS
DetailsDave Hannah
Chris ###-#### - acoustical ceiling grid - S. 1/2 2nd Floor
GCB-Fire Wall9/13/20169/14/20169/14/2016APART
DetailsTony Young
Chris ###-#### - requests call ahead,, storage room under stairs,, 2 layers ok
Routing - PLAN CHECK9/12/2016 9/13/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  9/13/2016 DONE
Issue and Courier  9/13/2016 DONE
emailed Kegan that it was on it's way baqck to her this morning
Routing - FIRE9/12/20169/12/20169/12/2016 PASS
DetailsKatie Marron
Modification to Gas Closet location. Revised report attached to plans.
Routing - PLAN CHECK9/12/2016 9/12/2016 PASS
DetailsCarl D Madsen
GCB-Framing9/7/20169/8/20169/8/2016APASS
DetailsMike Jordan
Chris ###-#### - 1st floor gypsum board ceiling - requests call ahead. 1st floor hard lids in restroom, ct and mri rooms and under north stairs. North half ceiling grid, 2nd floor.
Plan resubmittals received  9/8/2016 DONE
received 3 sets of plan mods-took to Carl M A10.0.1a, A4.0, A4.1, A6.0, ASI #6 (1), ASI #6 (2), ASI #6 (3), ASI #6 (4), ASI #6 (5), M1.0, M2.0, M2.1, P2.0, P2.1, P2.2, P3.0, P3.1, P4.0, P4.1, E2.0, E2.1, E2.2, E2.3, E2.4, E2.5, E3.0
Plan assigned to (CDM)8/3/20168/3/20168/26/2016 DONE
DetailsCarl D Madsen
GCB-Energy8/24/20168/25/20168/25/2016APASS
DetailsPhil Shearer
Chris ###-#### - requested call ahead - south 1/2 of 1st floor except popouts east side of the building.
GCB-Framing8/19/20168/22/20168/22/2016APASS
DetailsDave Hannah
Chris ###-#### - requested call ahead
GCB-Energy8/16/20168/16/20168/16/2016PPART
DetailsTony Young
Chris ###-#### - N. 1/2 first floor,, phase one,, exterior walls ok to cover
GCB-Framing8/15/20168/15/20168/15/2016PPASS
DetailsJim Storey
Chris ###-#### - north 1/2 first floor - requested call ahead north of grid line three except stoarage at stairs
Routing - FIRE8/10/20168/10/20168/11/2016 PASS
DetailsKatie Marron
Revised report attached to case.
Plan resubmittals received  8/3/2016 DONE
DetailsChristina Prado
Plan Modification received 8/3/16. Plans stamped and taken to CDM for review
GCB-Energy7/29/20167/29/20167/29/2016PPASS
DetailsDave Hannah
Chris ###-#### 2nd floor
GCB-Framing7/27/20167/28/20167/28/2016APASS
DetailsDave Hannah
Chris ###-#### - interior partitions south half of 2nd floor - requested call ahead
GCB-Energy7/25/20167/26/20167/26/2016APART
DetailsJim Sly
Chris ###-#### - north half of 2nd floor (thermal envelope) OK
GCB-Energy7/21/20167/22/20167/22/2016APART
DetailsDave Hannah
Chris ###-#### - exterior insulation and vapor barrier - requested call ahead slab edge ok north half
GCB-Framing7/19/20167/20/20167/20/2016APART
DetailsDave Hannah
Chris ###-#### - requested call ahead ext ok to cover the rest of the ext walls phase 2 restroom hard lids
GCB-Framing7/14/20167/18/20167/18/2016APART
DetailsDave Hannah
Chris ###-#### - requested call ahead second floor north half ok
GCB-Framing7/13/20167/14/20167/14/2016PPART
DetailsDave Hannah
Chris ###-#### - requested call ahead - interior walls on north half of 2nd floor from grid line 3.5 north ok to one side needs to seal floor pent. also south east ext corner ok to cocer after spec insp signs off
FIRE-Conference7/12/20167/14/20167/14/2016ADONE
DetailsKatie Marron
Onsite conference to discuss oxygen generator & vacuum equipment room, oxygen storage room and nitrogen storage room requirements. The proposed oxygen generator has a storage capacity of 60 gallons which is below the threshold in IFC 105.6.8, the client is limited to the 60 gallon size generator and not larger models. Separate compressed backup oxygen. tanks will be stored in a rated, vented closet. The nitrogen tanks are in a separate room and below the threshold of IFC 105.6.8. A louver is provide in the room with the oxygen generator and its operation coincides with the generators (field verify). Continuous ventilation is provided for these spaces.
GCB-Courtesy7/8/20167/11/20167/11/2016APASS
DetailsDave Hannah
Chris ###-#### - requests call ahead
GCB-Framing7/7/20167/8/20167/8/2016APART
DetailsDave Hannah
Chris ###-#### - requested call ahead ok to cover ext walls on the north east andwest sides
GCB-Framing7/6/20167/7/20167/7/2016APEND
DetailsDave Hannah
Chris ###-####
GCB-Framing7/1/20167/5/20167/5/2016APART
DetailsMike Jordan
Chris ###-#### - requested call ahead. Work in progress, needs to weld king studs, special inspection is required, install top clips on headers. Also discussed joint at curtain wall and second floor.
GCB-Framing6/16/20166/17/20166/17/2016APART
DetailsJim Sly
Partial framming requested by Chris Furman ###-#### please call first
Talked to Chris......OK'd Rock at Fire riser and Electr room providing approval from trades. Also talked about providing rating under stairway at storage room in lieu of walls.......Architect to approve and provide details and listings.
Routing - PLAN CHECK4/22/2016 4/22/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  4/22/2016 DONE
Issue and Courier  4/22/2016 DONE
called courier to come pick up and take to GC
GCB-Fndatn/slab ins/fld vent4/19/20164/20/20164/20/2016APART
DetailsJim Sly
Chris ###-#### - rebar insp.
South Concr Wall and Footing pads for canopy OK pending Allwest special inspection, tests and approvals.
Meeting  4/18/2016 DONE
as per Kegan the correct address is 5024 Chinden not 5019 Sawyer
Plan resubmittals received  4/15/2016 DONE
plan mod received 3 sets of 1.0, A1.01, A1.1, A1.1.1, A2.0, A3.0, A3.2, A4.0, AA4.1, A5.4, A5.6, A6.0, A6.1, A8.0.1, M1.0, M2.0, M2.1, M3.0, P1.0, P2.0, P2.1, P2.2, P3.0, P3.1, P3.2, P4.0, P4.1, E0.0, E0.1, E0.2, E1.0, E1.1, E2.0, E2.1, E2.2, E2.3, E2.4, E2.5, E2.6, E2.7, E2.8, E3.0, E4.0 - Took to Carl M
GCB-Fndatn/slab ins/fld vent4/13/20164/14/20164/14/2016APASS
DetailsMike Jordan
Chris ###-#### - rebar insp. east exterior stemwall ok.
GCB-Fndatn/slab ins/fld vent4/11/20164/12/20164/12/2016APART
DetailsJim Sly
Chris ###-####
Left Wall and Select interior footings OK pending Allwest special inspection, tests and approvals.
GCB-Fndatn/slab ins/fld vent4/7/20164/8/20164/9/2016APASS
DetailsDave Hannah
Chris ###-#### - Rebar Insp.
GCB-Footing4/5/20164/6/20164/6/2016APEND
DetailsDave Hannah
Chris ###-#### - rebar insp. for west footings
GCB-Fndatn/slab ins/fld vent3/28/20163/29/20163/29/2016APART
DetailsJim Sly
FOUNDATION REBAR INSP. - Chris ###-#### - requested call ahead
Found Wall at Back or East wall OK pending Allwest special inspection, tests and approvals.
GCB-Footing3/24/20163/25/20163/25/2016APART
DetailsJim Sly
REBAR INSP. - Chris ###-#### - requested call ahead
Footing at East or Back wall OK pending Allwest Special inspections, tests and approvals.
Plan assigned to (CDM)7/10/20157/10/20159/16/2015 DONE
DetailsCarl D Madsen
First review completed
Routing - PLAN CHECK9/15/2015 9/16/2015 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  9/16/2015 DONE
Issue and Courier  9/16/2015 DONE
Routing - FIRE9/9/20159/9/20159/15/2015 PASS
DetailsScott Arellano
Attached updated comments to plans.
Routing - PLAN CHECK8/26/2015 9/9/2015 PASS
DetailsCarl D Madsen
Plan resubmittals received  8/26/2015 DONE
resubmittals recieved 3 sets of sheet A0.0, A0.1, SP-1, A1.0, A1.1, A3.0, A5.0, A5.3, A5.6, A6.0, A6.1, A8.2 Took to Carl M
Telephone call  8/25/2015 DONE
received an email from Kegan to change address. Was 5024 W Chinden Blvd and they asked me to change it to 5019 N Sawyer Ave- See attached email
Routing - FIRE8/15/20157/10/20158/19/2015 FAIL
DetailsScott Arellano
Report attached to plans and emailed to architect.
1st review completed  8/19/2015 DONE
Routing - PLAN CHECK7/22/2015 8/15/2015 FAIL
DetailsCarl D Madsen
Routing - Mechanical Review7/13/2015 7/21/2015 PASS
DetailsTroy James
Routing - Plumbing Review7/21/2015 7/21/2015 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Public Works4/10/20157/10/20157/13/2015 PASS
DetailsBeverly Mountain
Plan resubmittals received  7/13/2015 DONE
received 3 sets of struc calcs Volume 1 & 2 taht were not submitted at intake-took to Carl M
Application received  7/8/2015 DONE
via Garden City Web Service
Routing - PLAN CHECK8/3/2016    
DetailsCarl D Madsen