Permit Information
Permit NumberGCB15-00102
StatusFinaled
Name NHS Community Services
Site Address 3627 N KAY
Project NameBLD2015-00103
Customer Number 
ePlanReviewNo
Description
(Common Parking Garage) Permit for the construction of a new 1,980 garage/storage building for use by residents of the Village Oak Subdivision. All work per the approved plans, attached plan review report and the attached engineering. This is a type VA to allow the S-1 occupancy on the second story. This building is not sprinklered. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (FNL)  6/23/2016 DONE
final inspection was done 6/21/16-permit is finaled
GCB-Final6/21/20166/21/20166/21/2016PPASS
DetailsChristina Prado
All inspections complete - inspection added to change status only
FIRE-Final Inspection5/31/20166/1/20166/1/2016APASS
DetailsKatie Marron
Life Safety Pass. Scope of work complete. Permit Finaled
CHANGE STATUS TO (ISS)  5/31/2016 DONE
was finaled w/o fire final by mistake
GCB-Final5/23/20165/24/20165/24/2016APASS
DetailsDave Hannah
Joe ###-#### - code: 631225*
GCB-Final5/13/20165/16/20165/16/2016ANR
DetailsJim Sly
Joe ###-#### - code: 631225*
Cut off nosing on landing to obtain 11" run. upper 3 tread stairway non compliant.
GCB-Final3/25/20163/28/20163/28/2016ANR
DetailsJim Sly
Joe ###-#### - code: 631225*
Re-built stairway.......Run still approx 1" short......Landings not poured.
GCB-Final2/25/20162/26/20162/26/2016AFAIL
DetailsMike Jordan
Joe ###-####. North doors require a landings. Stairway to storage above is non compliant. Needs to met IBC 7 inch max rise. 11 inch max run.
GCB-Shearwall12/17/201512/18/201512/18/2015APASS
DetailsDave Hannah
Grey ###-#### - Exterior Sheetrock Insp. requested
GCB-Framing12/3/201512/3/201512/3/2015PPASS
DetailsDave Hannah
Grey ###-####
GCB-Shearwall11/19/201511/19/201511/20/2015PPASS
DetailsDave Hannah
Shawn ###-####
GCB-Framing11/16/201511/17/201511/17/2015ANR
DetailsPhil Shearer
Shawn ###-####. no plans onsite

GCB-Fndatn/slab ins/fld vent9/29/20159/29/20159/29/2015PPASS
DetailsDave Hannah
Heron ###-####
GCB-Footing9/28/20159/28/20159/28/2015PPASS
DetailsJim Sly
Heron ###-####
Issue and Courier  9/8/2015 DONE
DetailsChristina Prado
Plan assigned to (CDM)7/17/20157/17/20159/5/2015 DONE
DetailsCarl D Madsen
First review completed.
PLANS/APPL TAKEN TO FRONT DESK  9/5/2015 DONE
Routing - PLAN CHECK8/7/2015 9/5/2015 PASS
DetailsCarl D Madsen
Plan resubmittals received  9/4/2015 DONE
DetailsChristina Prado
Received four sets of revised plan sheets marked COVER, 2 of 11, 3 of 11, 4 of 11, 5 of 11, 6 of 11, 7 of 11, 8 of 11, 9 of 11, 10 of 11 & 11 of 11, as well as four sets of structural calcs; Plans & calcs taken to CDM for further review
Routing - FIRE8/5/20157/17/20158/7/2015 PASS
DetailsScott Arellano
Comments attached to plans.
Routing - PLAN CHECK  8/5/2015 FAIL
DetailsCarl D Madsen
1st review completed  8/5/2015 DONE
DetailsCarl D Madsen
Application received  7/16/2015 DONE
via Garden City Web Service
Routing - Public Works7/17/20157/17/2015   
DetailsBeverly Mountain