Plan assigned to (CDM) | 6/13/2016 | 6/13/2016 | 8/26/2016 | | DONE |
Carl D Madsen
|
|
|
|
GCB-Final | 7/11/2016 | 7/11/2016 | 7/11/2016 | P | PASS |
Dave Hannah
|
|
|
Bill ###-#### - requested 30min call ahead
|
GCB-Final | 7/1/2016 | 7/1/2016 | 7/1/2016 | P | FAIL |
Mike Jordan
|
|
|
Bill ###-#### - requested call ahead. Provide code compliant handrails, remove chain and pad lock from gate and provide code compliant hardware. Flusher in womens restroom nees to be on turning side.
|
FIRE-Final Inspection | 6/29/2016 | 6/30/2016 | 6/30/2016 | A | PASS |
Katie Marron
|
|
|
Life Safety Passed
|
Telephone call | | | 6/23/2016 | | DONE |
|
|
|
no email or call-lost plans so took our copy to the copy place across the street and sent to GC
|
Routing - PLAN CHECK | 6/13/2016 | | 6/20/2016 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2016 | | DONE |
|
|
|
|
Issue and Courier | | | 6/20/2016 | | DONE |
|
|
|
sent plan mod plans back to NACFR
|
Plan resubmittals received | | | 6/13/2016 | | DONE |
|
|
|
Plan Mod resieved 3 sets of A2-took to Carl M
|
GCB-Energy | 2/22/2016 | 2/22/2016 | 2/22/2016 | P | PASS |
Dave Hannah
|
|
|
Bill ###-####
|
GCB-Framing | 2/17/2016 | 2/18/2016 | 2/18/2016 | A | PASS |
Dave Hannah
|
|
|
Beau ###-####
|
GCB-Shearwall | 2/16/2016 | 2/17/2016 | 2/17/2016 | A | PASS |
Dave Hannah
|
|
|
###-####
|
GCB-Fndatn/slab ins/fld vent | 1/7/2016 | 1/7/2016 | 1/7/2016 | P | PASS |
Dave Hannah
|
|
|
Huron ###-#### - requested 1pm insp.
|
GCB-Footing | 1/6/2016 | 1/6/2016 | 1/6/2016 | P | PASS |
Jim Sly
|
|
|
Huron ###-#### - requested 1:30p.m. insp. MTI didi Soil Compaction test
|
GCB-Footing | 1/4/2016 | 1/4/2016 | 1/4/2016 | P | NR |
Dave Hannah
|
|
|
Huron ###-####
|
GCB-Footing | 12/30/2015 | 12/31/2015 | 12/31/2015 | A | CANC |
Dave Hannah
|
|
|
Huron ###-#### - requested 11a.m. insp.
|
GCB-Footing | 12/16/2015 | 12/16/2015 | 12/16/2015 | P | FAIL |
Dave Hannah
|
|
|
Huron ###-#### still to wet
|
GCB-Footing | 12/14/2015 | 12/14/2015 | 12/14/2015 | P | FAIL |
Dave Hannah
|
|
|
Huron ###-#### footing is full of water and mud
|
Plan assigned to (CDM) | 8/4/2015 | 8/4/2015 | 11/5/2015 | | DONE |
Carl D Madsen
|
|
|
First review completed.
|
Routing - PLAN CHECK | 11/4/2015 | | 11/5/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2015 | | DONE |
|
|
|
|
Issue and Courier | | | 11/5/2015 | | DONE |
|
|
|
|
Routing - FIRE | 11/4/2015 | 11/4/2015 | 11/4/2015 | | PASS |
Scott Arellano
|
|
|
Revised report attached to plans.
|
Routing - PLAN CHECK | 10/8/2015 | | 11/4/2015 | | PASS |
Carl D Madsen
|
|
|
|
Plan resubmittals received | | | 10/29/2015 | | DONE |
|
|
|
resubmittals recieved 4 sets of A1, A1.1, A5.1, A5.2, A6, A7, A8, A9, 2 response letters-took to Carl M
|
Routing - FIRE | 10/7/2015 | 10/7/2015 | 10/8/2015 | | FAIL |
Katie Marron
|
|
|
Report attached to plans and emailed to architect.
|
Routing - PLAN CHECK | 8/27/2015 | | 10/7/2015 | | FAIL |
Carl D Madsen
|
|
|
|
Plan resubmittals received | | | 10/6/2015 | | DONE |
|
|
|
resubmittals received 3 sets of sheet A1, A2, A6, A6, A7-response letter & elevation sheet-took to Carl M
|
Routing - Mechanical Review | 8/28/2015 | | 9/2/2015 | | PASS |
Troy James
|
|
|
|
Routing - Plumbing Review | 9/1/2015 | | 9/1/2015 | | PASS |
Bill VanDegrift
|
|
|
1) vent floor drains
2) asse 1070 mixing valves required at the lavs
3) water to drinking fountain
4) assume tank type toilets if flush valves resubmit water design.
|
Routing - FIRE | 8/26/2015 | 8/4/2015 | 8/27/2015 | | FAIL |
Scott Arellano
|
|
|
Report attached to case and emailed to architect.
|
1st review completed | | | 8/27/2015 | | FAIL |
|
|
|
Failed Plan check, mechanical, Fire
|
Routing - PLAN CHECK | 8/6/2015 | | 8/26/2015 | | FAIL |
Carl D Madsen
|
|
|
E-Mailed plan review report to GC and Jason Tomlinson.
|
Plan resubmittals received | | | 8/25/2015 | | DONE |
|
|
|
resubmittal recieved 4 sheets of M2.1 and 1 cover sheet-took to Carl M
|
Routing - Mechanical Review | 8/5/2015 | | 8/6/2015 | | FAIL |
Troy James
|
|
|
emailed correction to applicant
|
Routing - Public Works | 8/4/2015 | 8/4/2015 | 8/5/2015 | | PASS |
Beverly Mountain
|
|
|
|
Application received | | | 8/3/2015 | | DONE |
|
|
|
via Garden City Web Service
|