GCB-Final | 6/29/2016 | 6/30/2016 | 6/30/2016 | A | PASS |
Dave Hannah
|
|
|
Derek ###-####
|
GCB-Final | 6/27/2016 | 6/28/2016 | 6/28/2016 | A | NR |
Dave Hannah
|
|
|
Derek ###-#### c/n on site needs ada rest rm signs vert grab bar door hardware gaurd rail and hand rail on stairs to upper level landings and door to be unlocked sign on exit doors.
|
FIRE-Final Inspection | 6/24/2016 | 6/27/2016 | 6/27/2016 | P | PASS |
Katie Marron
|
|
|
Verified previous items were corrected. Life Safety Pass.
|
FIRE-Final Inspection | 6/24/2016 | 6/27/2016 | 6/24/2016 | A | CANC |
Katie Marron
|
|
|
>> Inspection requested via mobile web by Derek Hurd Inspection cancelled via mobile web on Friday, June 24, 2016.
|
GCB-Final | 6/21/2016 | 6/24/2016 | 6/24/2016 | A | NR |
Mike Jordan
|
|
|
Derek ###-#### - requested 11a.m. and a call ahead. Fire/life safety final inspection failed.
|
FIRE-Final Inspection | 6/23/2016 | 6/24/2016 | 6/24/2016 | A | FAIL |
Katie Marron
|
|
|
The following items to be corrected: -Thumbturn deadbolts replaced with keyed on the front (designated exit) doors for each unit -Lever hardware on all three front doors replaced with single action lever hardware. -Fire Extinguishers placed in one the 2nd levels of two of the units.
|
GCB-Energy | 5/5/2016 | 5/6/2016 | 5/6/2016 | A | PASS |
Dave Hannah
|
|
|
Derek ###-####
|
GCB-Framing | 4/5/2016 | 4/5/2016 | 4/5/2016 | P | PASS |
Jim Sly
|
|
|
Derek ###-#### - requested call ahead
|
Plan assigned to (CDM) | 9/1/2015 | 9/1/2015 | 10/19/2015 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 9/29/2015 | | 10/19/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/19/2015 | | DONE |
|
|
|
|
Issue and Courier | | | 10/19/2015 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/16/2015 | | DONE |
|
|
|
resubmittals recieved 3 set of sheet g1, g2, a1, a2, s1 & 1comment letter-took to Carl M
|
GCB-Footing | 9/21/2015 | 9/21/2015 | 9/29/2015 | P | CANC |
Dave Hannah
|
|
|
Huron ###-####
|
Routing - FIRE | 9/25/2015 | 9/1/2015 | 9/29/2015 | | PASS |
Scott Arellano
|
|
|
Report attached to plans
|
Routing - PLAN CHECK | | | 9/25/2015 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 9/25/2015 | | FAIL |
|
|
|
|
Application received | | | 8/31/2015 | | DONE |
|
|
|
via Garden City Web Service
|
Routing - Public Works | 9/1/2015 | 9/1/2015 | | | |
Beverly Mountain
|
|
|
|