Permit Information
Permit NumberGCB15-00145
StatusFinaled
Name Cole Architects
Site Address 2900 W CHINDEN BLVD
Project NameBLD2015-00145
Customer Number 
ePlanReviewNo
Description
(RIVERSIDE HOTEL) """ PLAN MODIFICATION 2 TO REMOVE ELEVATOR#1 FROM THE SCOPE OF WORK TO BE DONE AT A LATER DATE AND SEPARATE PERMIT""" ""PLAN MODIFICATION TO ADDRESS A LACK OF CONTINUITY OF A FIRE BARRIER TO CONTINUE UP TO THE UNDERSIDE IF THE ROOF SHEETING. Permit for the construction new stairways and the installation of two new elevators. The new building enclosures for the elevators and stairways will be added on to the exterior of the existing building, new mini-split HVAC units will be installed to condition the new spaces. All work per the approved plans and the attached engineering. This building is fully fire sprinklered for the R occupancy. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 and 72 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (FNL)  3/3/2017 DONE
DetailsRita DeYoung
Issue and Courier  9/8/2016 DONE
sent with courier to GC
Plan resubmittals received  9/7/2016 DONE
plan mod recieved 3 sets of G000 & 1 cover sheet- called Kegan because this permit has been finaled so not sure why it's a plan mod-left message
Meeting  9/7/2016 DONE
called Dave Hannah to see about the permit being in final status when according to GC the permit is not finaled-the final was on the # elevator. They did a plan mod to eleminate the #1 elevator so they can get a C of O on the #2 elevator (?)-left message on Dave's cell phone
Routing - PLAN CHECK9/7/2016 9/7/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  9/7/2016 DONE
GCB-Final8/22/20168/22/20168/22/2016PPASS
DetailsDave Hannah
MJ ###-#### - requested call ahead-as per Dave Hannah when he did the building final there was no elevator # 1 (only elevator #2)-see plan mod
GCB-Final8/2/20168/3/20168/3/2016PFAIL
DetailsMike Jordan
MJ ###-#### - requested call ahead. Provide engineering for cable guards. Install cane guard as shown on approved plans. handrail extensions on interior stairs do not meet the minimum 12 inches. Provide hanrails/edge protection on ramp at accessible route.
FIRE-Final Inspection8/1/20168/1/20168/1/2016PPASS
DetailsKatie Marron
Fire life safety complete on ONE stairway and elevator at the far west end.
FIRE-Conference7/20/20167/20/20167/20/2016ADONE
DetailsKatie Marron
Phone discussion with MJ to discuss if notification devices will need to be tested. Told him yes and he is going to coordinate with hotel for a good time.
When performing this final try to final
GCB12-00032 and NAF16-00044
GCB-Ceiling Grid7/11/20167/12/20167/12/2016APASS
DetailsDave Hannah
MJ ###-####
Routing - PLAN CHECK6/8/2016 6/8/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  6/8/2016 DONE
CHANGE STATUS TO (ISS)  6/8/2016 DONE
pln mod done and called courier to come pick up and take to GC
GCB-Courtesy6/3/20166/3/20166/3/2016PDONE
DetailsDave Hannah
Mark ###-#### - need to look at slope of ramp
Plan resubmittals received  6/3/2016 DONE
plan mod submitted cover sheet-copy of correction notice & 2 sheets of A202-took to cArl M
GCB-Framing5/26/20165/26/20165/27/2016PPASS
DetailsDave Hannah
Mark ###-#### ok to cover 1 hr fire wall second floor top of wall in attic space
GCB-Framing5/18/20165/19/20165/19/2016AFAIL
DetailsJim Storey
Mark ###-#### need detail for new 1 hr walls thur roof on top of detail a202/b2//ok to cover east and south walls
GCB-Framing5/2/20165/2/20165/2/2016PPASS
DetailsDave Hannah
Mark ###-####
GCB-Framing4/28/20164/29/20164/29/2016APART
DetailsJim Sly
Mark ###-#### - Roof framing & steel insp for wire mesh - pouring at 10a.m.
MTI looking at Concrete. Roof framing not ready.
GCB-Stem wall3/3/20163/4/20163/4/2016AFAIL
DetailsPhil Shearer
MJ ###-#### Provide aproved changes to colunms
GCB-Stem wall2/29/20163/1/20163/1/2016PPASS
DetailsDave Hannah
Mark ###-#### - Rebar Insp. - requested 2p.m. insp. ftgs
GCB-Stem wall2/25/20162/26/20162/27/2016PPART
DetailsDave Hannah
MJ ###-#### - 30min call ahead requested - Rebar Insp.elev pit ftg ok
Plan assigned to (CDM)9/25/20159/25/201510/27/2015 DONE
DetailsCarl D Madsen
First review completed
Issue and Courier  10/27/2015 DONE
Routing - PLAN CHECK10/14/2015 10/26/2015 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  10/26/2015 DONE
Routing Off Site - STRUCTURAL10/14/2015 10/26/2015 PASS
DetailsCarl D Madsen
Routing - FIRE10/14/201510/14/201510/14/2015 PASS
DetailsScott Arellano
Comments attached to plans
Routing - PLAN CHECK10/14/2015 10/14/2015 PASS
DetailsCarl D Madsen
Plan resubmittals received  10/14/2015 DONE
resubmittals received 3 sets of sheets G002, C1.00, C2.00, C2.50, A202, A401, S2.2, S3.1, 3 SETS OF CALCS AND
1 COMMENT LETTER-took to Carl M
Routing - Public Works9/25/20159/25/201510/7/2015 PASS
DetailsBeverly Mountain
Routing Off Site - STRUCTURAL10/7/2015 10/7/2015 FAIL
DetailsCarl D Madsen
1st review completed  10/7/2015 FAIL
Routing - FIRE10/4/20159/25/201510/6/2015 FAIL
DetailsScott Arellano
Report attached to plans and emailed to architect.
Routing - PLAN CHECK  10/4/2015 FAIL
DetailsCarl D Madsen
Plan review report sent to GC and Cole Architects.
Application received  9/22/2015 DONE
via Garden City Web Service