GCE-Final | 8/23/2010 | 8/24/2010 | 8/24/2010 | A | PASS |
Doug A Poedy
|
|
|
Scope: FinalContact: Seth @ ###-####**Please sign the Inspection Record Card for both the Rough-In and Final**
|
GCE-Rough-In | 8/18/2010 | 8/19/2010 | 8/19/2010 | A | PASS |
Doug A Poedy
|
|
|
Scope: Rough-InContact: Seth @ ###-####. Ceiling hallway ok.
|
GCE-Rough-In | 8/16/2010 | 8/17/2010 | 8/17/2010 | A | FAIL |
Doug A Poedy
|
|
|
Scope: Rough-InContact: Seth @ ###-####. 348.30 FLC needs to be supported within 12" from boxes.
|
GCE-Rough-In | 6/30/2010 | 7/1/2010 | 7/1/2010 | A | PASS |
Jack Frank
|
|
|
Scope of Inspection: Rough-InContact: Seth @ ###-#### walls
|
Application received | | | 6/24/2010 | | DONE |
|
|
|
|