GCE-Final | 7/2/2010 | 7/6/2010 | 7/6/2010 | A | PASS |
Doug A Poedy
|
|
|
Scope: FinalContact: Tyler @ ###-####. P/S O/H Connect ok.
|
GCE-Final | 7/1/2010 | 7/2/2010 | 7/2/2010 | A | FAIL |
Doug A Poedy
|
|
|
Scope of Inspection: FinalContact: Tyler @ ###-####. No anti-oxidant on line side hot. Nuetral clipped and needs replaced. Needs plastic bushing entering service panel for grounding electrode wire.
|
Application received | | | 7/2/2010 | | DONE |
|
|
|
|