GCE-Final | 2/8/2011 | 2/9/2011 | 2/10/2011 | A | CANC |
Doug A Poedy
|
|
|
FinalRick @ ###-####call for access. Already finalled.
|
GCE-Final | 2/8/2011 | 2/9/2011 | 2/9/2011 | A | PASS |
Daryl DeGrange
|
|
|
FinalRick @ ###-####call for access final ok
|
GCE-Rough-In | 12/20/2010 | 12/21/2010 | 12/21/2010 | A | PASS |
Daryl DeGrange
|
|
|
Scope: Rough-InContact: Rick @ ri ok
|
GCE-Rough-In | 12/20/2010 | 12/20/2010 | 12/20/2010 | P | FAIL |
Daryl DeGrange
|
|
|
rick Phone #: ###-#### missing receptacles in master bedroom and livingroom. need decaded 20 amp circuit to bathroom plugs.non-conductive connector on #4 bare copper in service panel. connectors or bushings on conductors entring service panel. connect neutral and ground wires in panel.
|
GCE-Courtesy | 12/13/2010 | 12/14/2010 | 12/14/2010 | A | DONE |
Daryl DeGrange
|
|
|
Scope: Preliminary ConferenceContact: Rick @ ###-####In the afternoon pleaseCall in advance discuss kitchen appliance, dishwasher/disposal circuits. landing home runs in service panel-perpairing for rough-in inspection
|
Application received | | | 12/7/2010 | | DONE |
|
|
|
|