GCE-Final | 11/1/2011 | 11/1/2011 | 11/1/2011 | P | PASS |
Jack Frank
|
|
|
dave ###-#### final ok no card posted
|
GCE-Final | 10/31/2011 | 11/1/2011 | 11/1/2011 | A | NR |
Jack Frank
|
|
|
Dave @ ###-####PM Inspection needs extensions for boxes in shop area mudrings not flush with combustibe finish, correct all loose recepts, called
|
GCE-Permanent Service | 9/23/2011 | 9/23/2011 | 9/23/2011 | P | PASS |
Daryl DeGrange
|
|
|
p/s u/g n ok
|
GCE-Rough-In | 9/23/2011 | 9/23/2011 | 9/23/2011 | P | PASS |
Daryl DeGrange
|
|
|
David ###-#### rough-in ok cover
|
CHANGE STATUS TO (ISS) | | | 9/23/2011 | | |
|
|
|
re-open as this permit is for construction of building
|
GCE-Rough-In | 8/18/2011 | 8/19/2011 | 8/19/2011 | A | PASS |
Doug A Poedy
|
|
|
David @ ###-####. underground ok
|
GCE-Temporary Service | 8/3/2011 | 8/4/2011 | 8/4/2011 | A | PASS |
Daryl DeGrange
|
|
|
Temp ServiceDave @ ###-#### t/s o/h n ok ground rod shall be driven flush with finish grade
|
Application received | | | 8/3/2011 | | DONE |
|
|
|
|