GCE-Final | 8/30/2012 | 8/31/2012 | 8/31/2012 | P | PASS |
Daryl DeGrange
|
|
|
Zane @ ###-#### PM Inspection final ok
|
GCE-Rough-In | 8/20/2012 | 8/21/2012 | 8/21/2012 | A | PART |
Doug A Poedy
|
|
|
Zane @ ###-#### Ceiling Grid. Clouds ok
|
GCE-Rough-In | 8/7/2012 | 8/8/2012 | 8/8/2012 | P | PART |
Doug A Poedy
|
|
|
Zane @ ###-#### asked for a ceiling grid inspection on the large side of the unit. Ceiling ok to cover on west side except for s.w. far corner. 2 inch steel flex needs to be supported.
|
GCE-Rough-In | 7/23/2012 | 7/23/2012 | 7/23/2012 | P | PASS |
Daryl DeGrange
|
|
|
Zane @ ###-#### Ceiling Grid requested rough-in ok cover ceiling grid
|
GCE-Permanent Service | 6/25/2012 | 6/26/2012 | 6/26/2012 | A | PASS |
Daryl DeGrange
|
|
|
Zane @ ###-#### Meters B & C p/s u/g n ok two meters
|
GCE-Permanent Service | 6/21/2012 | 6/21/2012 | 6/22/2012 | A | FAIL |
Daryl DeGrange
|
|
|
Zane @ ###-#### No description of which unit,
|
GCE-Permanent Service | 6/20/2012 | 6/21/2012 | 6/21/2012 | A | NR |
Daryl DeGrange
|
|
|
Zane @ ###-#### Not ready, Panel not made up
|
GCE-Rough-In | 5/15/2012 | 5/16/2012 | 5/16/2012 | P | PASS |
Jack Frank
|
|
|
Zane @ ###-#### PM Inspection walls, hard ceilings and soffits
|
GCE-Rough-In | 4/17/2012 | 4/18/2012 | 4/18/2012 | A | PASS |
Jack Frank
|
|
|
Zane @ ###-#### walls for spaces 110 and 120 beauty school
|
Application received | | | 4/16/2012 | | DONE |
|
|
|
|