GCE-Final | 7/31/2015 | 8/3/2015 | 8/3/2015 | A | PASS |
Eric Story
|
|
|
Rick ###-#### final ok
|
GCE-Rough-In | 2/18/2015 | 2/18/2015 | 2/18/2015 | P | PASS |
Daryl DeGrange
|
|
|
Rick ###-#### correction completed, rough-in ok cover floor heat cabling in master bath
|
GCE-Rough-In | 2/17/2015 | 2/18/2015 | 2/18/2015 | A | FAIL |
Daryl DeGrange
|
|
|
Rick ###-#### Floor heat cable spacing not installed to manufactures requirements.Not more than 6 consecutive spacing of 1 1/2
|
Application received | | | 2/17/2015 | | DONE |
|
|
|
via Garden City Web Service
|