GCE-Final | 9/30/2015 | 10/1/2015 | 10/1/2015 | A | PASS |
Rex Boyles
|
|
|
Jay ###-#### final ok
|
GCE-Permanent Service | 9/30/2015 | 10/1/2015 | 10/1/2015 | A | PASS |
Rex Boyles
|
|
|
Jay ###-#### p/s u/g rec ok
|
GCE-Final | 9/30/2015 | 9/30/2015 | 9/30/2015 | P | CANC |
Rex Boyles
|
|
|
###-#### Jay Davis needs permanent service AND final inspection
|
GCE-Final | 9/16/2015 | 9/17/2015 | 9/17/2015 | A | FAIL |
Rex Boyles
|
|
|
Jay ###-#### - meter base repair 250.52(A)(1)-metal underground water pipe needs #6 bare copper conductor bonded within first 5 feet of entering structure. 250.52(A)(5)- at least 2 8'X1/2" ground rods driven more than 6 ' apart with #6 bare copper conductor to main disconnect. 250.24(A)- a premises wiring system supplied by a grounded ac service shall have a grounding electrode conductor connected to the grounded service conductor. 250.94-an intersystem bonding termination for connecting intersystem bonding conductors required for other systems shall be provided with a # 6 bare copper conductor. NOTE; CALL FOR PERMANENT SERVICE WHEN READY AND CALL FOR FINAL ALSO.
|
Application received | | | 9/16/2015 | | DONE |
|
|
|
via Garden City Web Service
|