GCE-Final | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | PASS |
Eric Story
|
|
|
final ok
|
GCE-Final | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | PASS |
Eric Story
|
|
|
final ok
|
GCE-Rough-In Permanent Service | 12/22/2015 | 12/22/2015 | 12/22/2015 | P | PASS |
Eric Story
|
|
|
Brandon ###-#### rough-in ok cover p/s u n ok
|
GCE-Rough-In Permanent Service | 12/16/2015 | 12/17/2015 | 12/17/2015 | A | FAIL |
Rex Boyles
|
|
|
Brandon ###-#### Dnst. bath vanity nm cable not installed in box. Garage receptacle nm cable not installed in box. 300.4(a)(1)-11/4" clearance required from bored hole to edge of stud. Nm cable within 6' of crawl needs protection
|
Application received | | | 12/16/2015 | | DONE |
|
|
|
via Garden City Web Service
|