GCM-Final | 6/24/2010 | 6/25/2010 | 6/25/2010 | A | PASS |
Dixie Fellows
|
|
|
Scope of Inspection: Final (Re-Inspection)Contact: Rich @ ###-####
|
GCM-Final | 6/23/2010 | 6/24/2010 | 6/24/2010 | A | NR |
Dixie Fellows
|
|
|
Scope of Inspection: Final (Re-Inspection)Contact: Rich @ ###-####..post not installed yet
|
GCM-Final | 2/3/2010 | 2/4/2010 | 2/4/2010 | A | FAIL |
Dixie Fellows
|
|
|
Contact Michel @ ###-####...need protection post
|
GCM-Final | 1/26/2010 | 1/27/2010 | 1/27/2010 | A | NR |
Dixie Fellows
|
|
|
Contacht Michelle @ ###-####...n/r per michelle
|
GCM-Final | 1/26/2010 | 1/27/2010 | 1/27/2010 | A | NR |
Dixie Fellows
|
|
|
Contacht Michelle @ ###-####...michelle called and cancelled
|
GCM-Rough-in | 10/26/2009 | 10/27/2009 | 10/27/2009 | A | PASS |
Dixie Fellows
|
|
|
Contact Michelle@###-####
|
GCM-Rough-in | 10/19/2009 | 10/20/2009 | 10/20/2009 | | FAIL |
Dixie Fellows
|
|
|
Am please, Contact Michele@###-####...furnace to be 18" above garage floor...condensate termination?
|
Application received | | | 10/15/2009 | | DONE |
|
|
|
|