GCM-Final | 6/9/2010 | 6/9/2010 | 6/9/2010 | A | PASS |
Alan Hauser
|
|
|
forgot to add time
|
GCM-Final | 6/8/2010 | 6/9/2010 | 6/9/2010 | A | PASS |
Alan Hauser
|
|
|
20# test on gas piping system passed
|
GCM-Final | 6/4/2010 | 6/7/2010 | 6/7/2010 | A | FAIL |
Dixie Fellows
|
|
|
Scope of Inspection: FinalContact: Debbie @ ###-####..NEED TO RE-TEST ALL GAS LINE AS IT FAILED AT R/I...NEED COMB AIR FOR W/H...NEED LADDER AT ACCESS TO FURNACE..DIXIE
|
GCM-Rough In & Pressure Test | 4/12/2010 | 4/13/2010 | 4/13/2010 | A | PART |
Dixie Fellows
|
|
|
R/I OK...GAS FAILED
|
CHANGE STATUS TO (ISS) | | | 4/13/2010 | | DONE |
Barbara Stitt
|
|
|
Incorectly voided change status back to issue
|
CHANGE STATUS TO (VOI) | | | 4/7/2010 | | DONE |
Barbara Stitt
|
|
|
see documents for email requesting permit to be voided
|
Application received | | | 4/2/2010 | | DONE |
|
|
|
|