GCM-Pressure Test | 9/7/2010 | 9/8/2010 | 9/8/2010 | A | PASS |
Dixie Fellows
|
|
|
Scope: Pressure TestContact: Eric @ ###-####...60lb gas ok to all equipment..discussed venting of boilers
|
GCM-Rough In & Pressure Test | 9/2/2010 | 9/3/2010 | 9/3/2010 | A | NR |
Dixie Fellows
|
|
|
Scope: Rough-In and Pressure TestContact: Eric @ ###-####Call in advance - applicant has requested inspection between 10 and 11....need a drawing for the gas line to size to equipment..contractor will fax it to me.
|
Application received | | | 8/31/2010 | | DONE |
|
|
|
|