GCM-Final | 10/26/2011 | 10/27/2011 | 10/27/2011 | A | PASS |
Alan Hauser
|
|
|
|
GCM-Final | 10/26/2011 | 10/27/2011 | 10/27/2011 | A | PASS |
Alan Hauser
|
|
|
|
GCM-Final | 10/19/2011 | 10/20/2011 | 10/20/2011 | A | FAIL |
Dixie Fellows
|
|
|
Debbie @ ###-####Call for access...need comb air at equipment...air balance ok..need f/p called for final
|
GCM-Rough-in | 8/29/2011 | 8/30/2011 | 8/30/2011 | A | PASS |
Dixie Fellows
|
|
|
aaron ###-#### no tenant at this time..wanted heat in the building before winter
|
GCM-Rough In & Pressure Test | 8/25/2011 | 8/29/2011 | 8/29/2011 | A | FAIL |
Dixie Fellows
|
|
|
Debbie @ ###-####Duct Blast Test at 9 a.m....need stamped and approved Manual J..need to remove insulation as I'm unable to see gas line..ductwork, etc..I see no dampers in any of the ductwork...flue and intake terminations not per manuf..secondary drain must go to a conspicuous location or have an auto shut-off
|
GCM-Rough In & Pressure Test | 8/25/2011 | 8/26/2011 | 8/26/2011 | A | NR |
Dixie Fellows
|
|
|
Debbie @ ###-####Duct Blast Test at 9 a.m...debbie will reschedule for mon am
|
Application received | | | 8/11/2011 | | DONE |
|
|
|
|