GCM-Final | 1/5/2012 | 1/6/2012 | 1/6/2012 | A | PASS |
Dixie Fellows
|
|
|
Travis @ ###-####
|
GCM-Final | 11/30/2011 | 12/1/2011 | 12/1/2011 | A | PART |
Bill VanDegrift
|
|
|
Travis @ ###-#### south test still leaking will add more units to the permit and call when ready
|
GCM-Pressure Test | 11/22/2011 | 11/23/2011 | 11/23/2011 | A | PART |
Bill VanDegrift
|
|
|
Travis @ ###-#### pt on most of the units ok, will retest the southern most unit and the 4th unit from the south along with two units in service that will need to be scheduled for a shutdown for testing. center section north of D&B to restaurant.
|
GCM-Pressure Test | 11/22/2011 | 11/22/2011 | 11/22/2011 | P | FAIL |
Bill VanDegrift
|
|
|
travis will call when ready idaho state mec. code- 2# systems require a pressure test of 60 psi on a 100 psi gauge. a pressure test of 20 psi is required on an ounce system with a 30 psi gauge.
|
GCM-Pressure Test | 11/21/2011 | 11/22/2011 | 11/22/2011 | A | NR |
Dixie Fellows
|
|
|
Travis @ ###-####....rescheduled for pm..not ready
|
Application received | | | 11/7/2011 | | DONE |
|
|
|
|