GCM-Final | 4/17/2012 | 4/23/2012 | 4/23/2012 | A | PASS |
Alan Hauser
|
|
|
|
GCM-Final | 4/16/2012 | 4/17/2012 | 4/17/2012 | A | NR |
Dixie Fellows
|
|
|
Debbie @ ###-####...no access to garage..putting epoxy on floor...no access to range, it is covered by big doors
|
GCM-Rough-in | 1/6/2012 | 1/6/2012 | 1/6/2012 | A | PASS |
Dixie Fellows
|
|
|
r/i and gas ok...f/p ok...duct blaster ok
|
GCM-Final | 1/6/2012 | 1/6/2012 | 1/6/2012 | A | CANC |
Dixie Fellows
|
|
|
should have been a r/i
|
GCM-Rough-in | 1/4/2012 | 1/5/2012 | 1/5/2012 | A | PART |
Dixie Fellows
|
|
|
Debbie @ ###-####...r/i and 20lb gas ok...duct blaster ok....need cement board behind both sides at back of f/p where it connects to the chase
|
GCM-Rough In & Pressure Test | 12/28/2011 | 12/29/2011 | 12/29/2011 | A | FAIL |
Dixie Fellows
|
|
|
call in advance Debbie ###-####AM inspection...r/i and gas failed...duct blaster ok...posted c/n on furnace
|
GCM-Pressure Test | 12/23/2011 | 12/27/2011 | 12/27/2011 | A | PART |
Bill VanDegrift
|
|
|
contact Debbie ###-####requested a 9:00 AM inspection. 20# test ok no duct balster ri not ready
|
Application received | | | 12/6/2011 | | DONE |
|
|
|
|