GCM-Final | 10/1/2012 | 10/3/2012 | 10/3/2012 | A | PASS |
Dixie Fellows
|
|
|
###-#### Call for access
|
GCM-Final | 9/19/2012 | 9/19/2012 | 9/19/2012 | P | FAIL |
Dixie Fellows
|
|
|
Debbie @ ###-#### Call for access...need comb air for w/h
|
GCM-Final | 9/7/2012 | 9/10/2012 | 9/10/2012 | P | FAIL |
Dixie Fellows
|
|
|
Debbie @ ###-####...door locked
|
GCM-Rough In & Pressure Test | 5/22/2012 | 5/23/2012 | 5/23/2012 | A | PASS |
Dixie Fellows
|
|
|
Debbie @ ###-####...duct blaster ok..r/i ok
|
GCM-Rough In & Pressure Test | 5/21/2012 | 5/22/2012 | 5/22/2012 | A | PART |
Dixie Fellows
|
|
|
Debbie @ ###-#### Duct Blast Test scheduled for 9 a.m.....duct blaster ok...20lb gas ok....no manual J on site
|
Application received | | | 5/14/2012 | | DONE |
|
|
|
|