GCM-Final | 7/13/2012 | 7/16/2012 | 7/16/2012 | A | PASS |
Dixie Fellows
|
|
|
Jennifer @ ###-#### AM inspection requested
|
GCM-Pellet or Wood Stove | 6/4/2012 | 6/5/2012 | 6/5/2012 | A | PASS |
Dixie Fellows
|
|
|
gas f/p jennifer ###-####
|
GCM-Pellet or Wood Stove | 6/4/2012 | 6/4/2012 | 6/4/2012 | P | NR |
Dixie Fellows
|
|
|
gas fireplace....jennifer ###-####...framer unable to remove sheeting above f/p until tues am...i rescheduled for then
|
GCM-Pressure Test | 6/1/2012 | 6/4/2012 | 6/4/2012 | A | PASS |
Dixie Fellows
|
|
|
Jenifer @ ###-#### AM inspection requested. first thing....20lb gas ok
|
GCM-Rough-in | 5/31/2012 | 6/1/2012 | 6/1/2012 | A | FAIL |
Alan Hauser
|
|
|
guage on 16# for gasline
|
GCM-Rough In & Pressure Test | 5/29/2012 | 5/30/2012 | 5/30/2012 | A | FAIL |
Alan Hauser
|
|
|
duct blaster ok, hvac ok, pressure test on gasline has dropped to 10#
|
Application received | | | 5/23/2012 | | DONE |
|
|
|
|