GCM-Final | 9/10/2012 | 9/10/2012 | 9/12/2012 | P | NR |
Dixie Fellows
|
|
|
Bonnie @ ###-####....no air balance on site..they don't even know if it has been done yet (This activity was added in error so we have changed the case status back to Issued.)
|
GCM-Final | 9/12/2012 | 9/12/2012 | 9/12/2012 | P | PASS |
Dixie Fellows
|
|
|
Rob @ ###-####
|
GCM-Final | 9/11/2012 | 9/12/2012 | 9/12/2012 | A | NR |
Dixie Fellows
|
|
|
Rob @ ###-####...cancelled by rob
|
GCM-Rough In & Pressure Test | 7/24/2012 | 7/25/2012 | 7/27/2012 | A | PASS |
Dixie Fellows
|
|
|
Rob @ ###-####....r/i and 20lb gas ok....DUCT BLASTER MUST BE DONE AT FINAL WITH MANUAL J. ON STE
|
Application received | | | 7/24/2012 | | DONE |
|
|
|
|