GCM-Final | 12/20/2012 | 12/20/2012 | 12/21/2012 | P | PASS |
Dixie Fellows
|
|
|
Maggy @ ###-#### Call in advance
|
GCM-Rough In & Pressure Test | 12/18/2012 | 12/19/2012 | 12/19/2012 | A | FAIL |
Dixie Fellows
|
|
|
am please....talked to jim sly and he said have them put a fire collar and fire caulk around existing comb air pipe into the garage
|
Application received | | | 12/18/2012 | | DONE |
|
|
|
|