GCM-Final | 2/6/2013 | 2/7/2013 | 2/7/2013 | P | PASS |
Dixie Fellows
|
|
|
Russ @ ###-####
|
GCM-Final | 2/4/2013 | 2/4/2013 | 2/5/2013 | P | FAIL |
Dixie Fellows
|
|
|
Russ @ ###-####....cabinet depth above cook-top doesn't meet manuf specs
|
GCM-Rough-in | 1/2/2013 | 1/2/2013 | 1/2/2013 | P | PASS |
Dixie Fellows
|
|
|
Russ @ ###-####...r/i and 20lb gas ok...f/p ok..duct blaster ok
|
Application received | | | 12/27/2012 | | DONE |
|
|
|
|