GCM-Final | 8/7/2013 | 8/8/2013 | 8/8/2013 | A | PASS |
Dixie Fellows
|
|
|
Craig ###-####
|
GCM-Final | 7/26/2013 | 7/29/2013 | 7/29/2013 | A | FAIL |
Dixie Fellows
|
|
|
Jeff ###-####...complete termination on w/h
|
GCM-Final | 7/25/2013 | 7/26/2013 | 7/26/2013 | A | NH |
Dixie Fellows
|
|
|
###-#### Jeff...door locked
|
GCM-Rough In & Pressure Test | 1/11/2013 | 1/11/2013 | 1/11/2013 | P | PASS |
Dixie Fellows
|
|
|
Andrea ###-####....check duct blaster on final
|
GCM-Rough In & Pressure Test | 1/9/2013 | 1/10/2013 | 1/10/2013 | A | CANC |
Dixie Fellows
|
|
|
Jeff @ ###-####....cancelled by jeff
|
Application received | | | 1/8/2013 | | DONE |
|
|
|
|