GCM-Final | 5/8/2013 | 5/9/2013 | 5/10/2013 | A | PASS |
Bill VanDegrift
|
|
|
###-#### elevated static due to owner supplied termination devices, pool bath went with electric heater, verious field routing of ductwork in crawl.
|
GCM-Pressure Test | 4/16/2013 | 4/17/2013 | 4/17/2013 | A | PART |
Bill VanDegrift
|
|
|
Joe @ ###-#### Inspection occurred 4/16 1- 60# and 3-20# gas teas to outside fixtures and pool equipment ok
|
GCM-Pressure Test | 4/15/2013 | 4/15/2013 | 4/15/2013 | A | NR |
Bill VanDegrift
|
|
|
will recall
|
GCM-Rough-in | 2/28/2013 | 2/28/2013 | 2/28/2013 | P | PART |
Alan Hauser
|
|
|
mother-in-law house ok, no more inspections untill main house crawlspace duct installed and approved manual J on site for inspection. duct blast test and air balance report has to be done by final.
|
GCM-Rough-in | 2/5/2013 | 2/6/2013 | 2/7/2013 | A | PART |
Bill VanDegrift
|
|
|
Joe @ ###-#### Call for access - gated community top ri ok, 1-60# and 2-20# tests ok. will recall when crawlspace is complete. 2hours inspection time verify at final duct blast test at 4 cfm per sq. foot. no equipment installed at this time
|
GCM-Pressure Test | 2/4/2013 | 2/5/2013 | 2/6/2013 | P | NR |
Dixie Fellows
|
|
|
Joe @ ###-#### Call for access - gated community....manual J not ready
|
GCM-Rough-in | 2/4/2013 | 2/4/2013 | 2/4/2013 | P | FAIL |
Dixie Fellows
|
|
|
Joe @ ###-#### Call for access - gated community...need revised manual J
|
Application received | | | 1/29/2013 | | DONE |
|
|
|
|