GCM-Final | 4/2/2013 | 4/2/2013 | 4/2/2013 | A | PASS |
Dixie Fellows
|
|
|
this was a test on an existing gas line that int gas required before they would set the meter
|
GCM-Rough In & Pressure Test | 4/1/2013 | 4/2/2013 | 4/2/2013 | A | PASS |
Dixie Fellows
|
|
|
Joe @ ###-#### Call in advance...20lb gas ok
|
Application received | | | 4/1/2013 | | DONE |
|
|
|
|