GCM-Final | 5/20/2013 | 5/21/2013 | 5/21/2013 | A | PASS |
Dixie Fellows
|
|
|
Russ ###-####
|
GCM-Pellet or Wood Stove | 4/12/2013 | 4/15/2013 | 4/15/2013 | A | FAIL |
Dixie Fellows
|
|
|
###-####...the pellet stove is being installed by a different company (LEISURE TIME)
|
GCM-Rough In & Pressure Test | 4/12/2013 | 4/15/2013 | 4/15/2013 | A | PASS |
Dixie Fellows
|
|
|
###-####...r/i and 20lb gas ok...CHECK DUCT BLASTER AT FINAL
|
Application received | | | 4/12/2013 | | DONE |
|
|
|
|