GCM-Final | 10/2/2013 | 10/2/2013 | 10/2/2013 | P | PASS |
Dixie Fellows
|
|
|
Oleg ###-#### Call first
|
GCM-Final | 9/26/2013 | 9/26/2013 | 9/26/2013 | P | PASS |
Dixie Fellows
|
|
|
Oleg ###-#### call 1st
|
GCM-Pressure Test | 7/26/2013 | 7/29/2013 | 7/29/2013 | P | PASS |
Dixie Fellows
|
|
|
Oleg ###-####....20lb gas ok
|
GCM-Pressure Test | 7/24/2013 | 7/25/2013 | 7/25/2013 | A | FAIL |
Dixie Fellows
|
|
|
OLEG ###-####...bad guage
|
GCM-Rough In & Pressure Test | 7/24/2013 | 7/22/2013 | 7/24/2013 | P | CANC |
Dixie Fellows
|
|
|
Oleg ###-####...THIS WAS DONE THIS AM
|
GCM-Rough-in | 7/24/2013 | 7/19/2013 | 7/24/2013 | P | CANC |
Dixie Fellows
|
|
|
Oleg ###-####...ALREADY DONE
|
GCM-Pressure Test | 7/23/2013 | 7/24/2013 | 7/24/2013 | A | FAIL |
Dixie Fellows
|
|
|
OLEG ###-####...guage pegged
|
GCM-Rough In & Pressure Test | 7/23/2013 | 7/23/2013 | 7/23/2013 | P | PEND |
Dixie Fellows
|
|
|
Olleg-###-####....DIDNT GET THE INSPECTION UNTIL 1:30 AND I HAD ALREADY LEFT THE AREA...UNABLE TO GET TO IT TODAY SO I RESCHEDULED IT FOR WED AM
|
GCM-Rough In & Pressure Test | 7/19/2013 | 7/19/2013 | 7/19/2013 | P | PART |
Dixie Fellows
|
|
|
Oleg ###-####...r/i and f/p ok....need to do a pressure test
|
GCM-Rough In & Pressure Test | 7/17/2013 | 7/17/2013 | 7/18/2013 | P | NR |
Dixie Fellows
|
|
|
Oleg ###-#### ...called Oleg about ouside air to 600cfm hood and check for 6" outside air to r/a...no manual j on site at time
|
Application received | | | 7/15/2013 | | DONE |
|
|
|
|