GCM-Final | 10/2/2013 | 10/2/2013 | 10/7/2013 | P | PASS |
Dixie Fellows
|
|
|
Oleg ###-#### call first
|
GCM-Final | 9/26/2013 | 9/26/2013 | 9/26/2013 | P | FAIL |
Dixie Fellows
|
|
|
Oleg ###-#### call 1st...need upper comb air at equipment
|
GCM-Rough-in | 7/19/2013 | 7/19/2013 | 7/19/2013 | P | PASS |
Dixie Fellows
|
|
|
|
GCM-Rough In & Pressure Test | 7/17/2013 | 7/17/2013 | 7/18/2013 | P | PART |
Dixie Fellows
|
|
|
Oleg ###-####......r/i ok for cover...20lb gas ok...need to fix fire-stop at f/p
|
Application received | | | 7/15/2013 | | DONE |
|
|
|
|