GCM-Final | 9/16/2014 | 9/17/2014 | 9/17/2014 | A | PASS |
Dixie Fellows
|
|
|
Patty ###-####
|
GCM-Pressure Test | 8/15/2014 | 8/15/2014 | 8/15/2014 | P | PASS |
Dixie Fellows
|
|
|
Patty ###-####..60lb test to all equipment ok
|
GCM-Pressure Test | 7/17/2014 | 7/18/2014 | 7/18/2014 | A | PART |
Dixie Fellows
|
|
|
###-####..60lb test from meter to all regs ok..20lb test on drops to both f/p's and furnaces ok
|
GCM-Pressure Test | 5/28/2014 | 5/29/2014 | 5/29/2014 | A | PART |
Alan Hauser
|
|
|
60# test ok on two legs of system, n.e. corner along front and 2nd corridor from the east
|
Application received | | | 11/12/2013 | | DONE |
|
|
|
|