GCM-Final | 7/18/2014 | 7/18/2014 | 7/18/2014 | P | PASS |
Dixie Fellows
|
|
|
final ok
|
GCM-Final | 7/15/2014 | 7/16/2014 | 7/16/2014 | P | PART |
Dixie Fellows
|
|
|
THIS JOB IS READY TO FINAL..i'M WAITING FOR THE OTHER 3 CONTRACTORS TO BE READY FOR THEIR FINALS
|
GCM-Final | 7/14/2014 | 7/15/2014 | 7/15/2014 | P | FAIL |
Dixie Fellows
|
|
|
matt ###-####..need to verify louvers are interlocked with incinerator..complete condensates..regulator at incinerator needs to be vented outside..drain off mini-split location? verify fan in equipment room is working
|
GCM-Rough-in | 4/2/2014 | 4/2/2014 | 4/2/2014 | P | PART |
Dixie Fellows
|
|
|
matt ###-#### fire damper..OK TO FRAME AROUND F/DAMPER
|
GCM-Rough-in | 4/1/2014 | 4/2/2014 | 4/2/2014 | A | FAIL |
Dixie Fellows
|
|
|
Matt ###-#### Fire Damper cover rough-in..NEED MANUF SPECS FOR FIRE DAMPER
|
GCB-Courtesy | 3/31/2014 | 3/31/2014 | 3/31/2014 | A | DONE |
Chad Schwendiman
|
|
|
Matt ###-#### -
|
GCM-Rough-in | 3/19/2014 | 3/20/2014 | 3/20/2014 | P | PART |
Dixie Fellows
|
|
|
Angela ###-####...FURNACE CONDENSATES APPROVED BY DARREL SPIVEY...OK FOR COVER
|
GCM-Rough-in | 3/19/2014 | 3/19/2014 | 3/19/2014 | P | FAIL |
Dixie Fellows
|
|
|
angela ###-####...condensates from furnaces not draining properly
|
GCM-Rough-in | 2/26/2014 | 2/27/2014 | 2/27/2014 | A | PART |
Dixie Fellows
|
|
|
Matt ###-####..ok to insulate ducts
|
GCM-Rough-in | 2/25/2014 | 2/26/2014 | 2/26/2014 | P | FAIL |
Dixie Fellows
|
|
|
Matt ###-####...this is not the correct address for this job
|
Application received | | | 2/4/2014 | | DONE |
|
|
|
|