GCM-Final | 6/13/2014 | 6/13/2014 | 6/13/2014 | P | PASS |
Dixie Fellows
|
|
|
Joe ###-#### re-inspect
|
GCM-Final | 6/9/2014 | 6/9/2014 | 6/9/2014 | P | FAIL |
Dixie Fellows
|
|
|
Joe ###-####..need a new drawing from engineer to match changes..needs to be stamped and signed
|
GCM-Rough-in | 5/6/2014 | 5/7/2014 | 5/7/2014 | A | PASS |
Dixie Fellows
|
|
|
Joe ###-#### noted with request not responsible for the installation of gas line
|
Application received | | | 5/6/2014 | | DONE |
|
|
|
|