GCP-Final | 11/4/2010 | 11/5/2010 | 11/5/2010 | A | PASS |
Daryl Spivey
|
|
|
Scope: FinalContact: Raul @ ###-####
|
GCP-Final | 11/3/2010 | 11/3/2010 | 11/3/2010 | P | FAIL |
Daryl Spivey
|
|
|
Same inspection but forgot to assign time............ds
|
GCP-Final | 11/2/2010 | 11/3/2010 | 11/3/2010 | A | FAIL |
Daryl Spivey
|
|
|
Scope: FinalContact: Raul @ ###-#### need to install 2 in. dcva in horizontal, not approved for vertical, need check installed on cold side of recirc tie in, need union on hot side of W/H, and lavs need to have approved tempering device installed..............ds
|
GCP- Rough-in | 8/17/2010 | 8/18/2010 | 8/18/2010 | A | PASS |
Daryl Spivey
|
|
|
Scope: Rough-InContact: Raul @ ###-#### needs nail plates installed ..........ds
|
GCP-Under Floor | 7/1/2010 | 7/2/2010 | 7/2/2010 | A | PART |
Daryl Spivey
|
|
|
Scope of Inspection: Underfloor (Groundwork)Contact: Raul @ ###-#### waste and vent tested ok............ds
|
Application received | | | 7/2/2010 | | DONE |
|
|
|
|