GCP-Final | 12/18/2012 | 12/18/2012 | 12/18/2012 | A | PASS |
Daryl Spivey
|
|
|
Luke ###-####
|
GCP-Final | 12/14/2012 | 12/17/2012 | 12/17/2012 | A | FAIL |
Daryl Spivey
|
|
|
Luke @ ###-#### DCVA's are over 5 ft. AFF, need tempered water to lavs, expansion tanks required, T&P's not to code and d/f needs caulked..........ds
|
GCP- Rough-in | 11/28/2012 | 11/29/2012 | 11/29/2012 | P | PASS |
Daryl Spivey
|
|
|
Luke @ ###-#### PM Inspection
|
GCP- Rough-in | 11/19/2012 | 11/19/2012 | 11/19/2012 | P | PART |
Daryl Spivey
|
|
|
Luke @ ###-#### ground work on east side tested ok.........ds
|
GCP- Rough-in | 11/16/2012 | 11/16/2012 | 11/16/2012 | P | PART |
Daryl Spivey
|
|
|
Luke @ ###-#### As late in the day as possible
|
GCP- Rough-in | 11/15/2012 | 11/15/2012 | 11/15/2012 | P | NR |
Daryl Spivey
|
|
|
Luke @ ###-#### Request for Preliminary Inspection to discuss project conference only.........ds
|
Application received | | | 11/15/2012 | | DONE |
|
|
|
|