GRD-Final | 5/22/2015 | 5/26/2015 | 5/27/2015 | A | PASS |
Evan Jenkins
|
|
|
Please call with any questions. Megan
Thanks! Phone #: ###-#### Inspection requested via web by Megan Swift
|
Issue PAID IN FULL permit | | | 3/2/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card-GRD | | | 3/2/2015 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card-GRD | | | 3/2/2015 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | 2/20/2015 | | 2/27/2015 | | PASS |
Cody Riddle
|
|
|
PER EPLAN APPROVAL
|
Routing - PLAN CHECK | 2/27/2015 | | 2/27/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2015 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 2/27/2015 | | DONE |
|
|
|
Need GC Form, RP, and Revised Value
NO BUILDING PLAN REVIEW OR FIRE REVIEW FEE PER JCB
|
Routing - FIRE | 2/20/2015 | 2/20/2015 | 2/25/2015 | | PASS |
Scott Arellano
|
|
|
No comments necessary.
|
Routing PW Drainage | 2/20/2015 | | 2/23/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 2/20/2015 | | 2/23/2015 | | PASS |
Christina Prado
|
|
|
Need Engineering information for fencing
APPROVED AS NOTED
|
Routing - Erosion and Sediment | 2/20/2015 | | 2/23/2015 | | PASS |
Evan Jenkins
|
|
|
Owyhee Park - Tennis Court - Grading & Drainage)Permit for the removal and replacement of four existing Tennis Courts. Replacement courts to be post-tension asphalt. To replace 40' lineal sidewalk and install 10' fencing around the new proposed tennis courts as approved per attached engineering details. All drainage will remain the same and utilize existing turf grass area surrounding pad. O & M and Geotechnical reports waived per Brian Murphy. No site utilities covered under this scope of work. No structures are to be constructed or installed under this permit
|
Routing - PLANNING Land Div | 2/20/2015 | | 2/23/2015 | | PASS |
Dave Abo
|
|
|
|
Routing - Addressing | 2/20/2015 | | 2/20/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 2/20/2015 | | 2/20/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/20/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 2/20/2015 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/20/2015 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to Christina | 2/20/2015 | | 2/20/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 2/19/2015 | | FAIL |
Christina Prado
|
|
|
See uploaded checklist in eplan for details
|
Application received | | | 2/18/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 18 2015 11:37AM
|