FIRE-Final Inspection | 10/29/2015 | 10/29/2015 | 11/4/2015 | P | PASS |
Troy Cobbley
|
|
|
Pass per Scott Arellano
|
Routing - FIRE | 6/4/2015 | 6/4/2015 | 6/23/2015 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing - Erosion and Sediment | 6/23/2015 | | 6/23/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Any Earth Disturbance)
(TERRY DAY PARK PLAYGROUND) - Grading permit to install landscaping and related sidewalk improvements to existing park for future playground equipment
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/23/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/23/2015 | | DONE |
|
|
|
need GC form and rev cert of val
|
Issue PAID IN FULL permit | | | 6/23/2015 | | DONE |
|
|
|
|
Inspection Record Card-GRD | | | 6/23/2015 | | DONE |
|
|
|
|
Plan assigned to (BLH)Brittany | 6/4/2015 | | 6/23/2015 | | DONE |
Brittany Hill
|
|
|
|
Routing - PLAN CHECK | 6/4/2015 | | 6/23/2015 | | PASS |
Brittany Hill
|
|
|
Need ESC resubmittal
|
Routing - PLANNING Land Div | 6/4/2015 | | 6/9/2015 | | PASS |
Dave Abo
|
|
|
|
Routing - Erosion and Sediment | 6/4/2015 | | 6/8/2015 | | FAIL |
Evan Jenkins
|
|
|
Erosion and Sediment Control Site Map is Required for Approval per BCC 8-17. Evan Jenkins 794.3958
(ESC Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(TERRY DAY PARK PLAYGROUND) - Grading permit to install landscaping and related sidewalk improvements to existing park for future playground equipment
|
Routing - PLANNING | 6/4/2015 | | 6/5/2015 | | PASS |
Cody Riddle
|
|
|
|
Routing - Addressing | 6/4/2015 | | 6/5/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 6/4/2015 | | 6/5/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Drainage | 6/5/2015 | | 6/5/2015 | | PASS |
Brian Murphy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/4/2015 | | DONE |
|
|
|
|
Intake Approval | | | 6/4/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/4/2015 | | DONE |
|
|
|
|
Intake Approval | | | 6/3/2015 | | FAIL |
|
|
|
Need to re-upload drawings as landscape layout and lable each individually. Need 304 Form and Erosion and Sediment Control Narratvie.
|
Application received | | | 6/2/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 2 2015 12:05PM
|
GRD-Final | 9/15/2015 | 9/15/2015 | | P | |
|
|
|
Maegan Phone #: ###-####
|