GRD-Final | 5/19/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Jim Sly
|
|
|
Jared Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/19/2016 | | DONE |
|
|
|
|
Telephone call | | | 5/16/2016 | | DONE |
|
|
|
called Kent to let know the grading permit was never picked up. He said he'd pick it up soon
|
Application received | | 7/1/2015 | 7/9/2015 | | DONE |
|
|
|
|
Plan assigned to (CAN) Candy | 7/2/2015 | | 7/9/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Routing - PLAN CHECK | | | 7/9/2015 | | PASS |
Candy A. Nichols
|
|
|
|
Telephone call | | | 7/9/2015 | | DONE |
|
|
|
as per Scott Arellano no fire plan review needed
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/9/2015 | | DONE |
|
|
|
need GC
|
Inspection Record Card-GRD | | | 7/9/2015 | | DONE |
|
|
|
|
Telephone call | | | 7/9/2015 | | DONE |
|
|
|
Kent called and i told him the permit was ready to go other than the GC form
|
Telephone call | | | 7/7/2015 | | DONE |
|
|
|
as per Brian Murphy-called Kent to get the cubic yards of dirt moved before I can figure fees-Kent is going to talk to the engineer and get back to me
|
Meeting | | | 7/7/2015 | | DONE |
|
|
|
Kent asked me to talk to the fire plan reviewer and see if there are any stipulation's for fire. I talked to Scott A-he looked at the plans and said no
|
Routing - Erosion and Sediment | 7/2/2015 | | 7/2/2015 | | PASS |
Andy J. Long
|
|
|
ESC plan submitted and approved. Valid RP and PD designated
|
Routing - PUBLIC WORKS GRADING | 7/2/2015 | | 7/2/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 7/2/2015 | | 7/2/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/2/2015 | | DONE |
|
|
|
|
Intake Approval | | | 7/2/2015 | | PASS |
Brian Murphy
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/2/2015 | | DONE |
|
|
|
doing journel payment-Kent will email Rita the account #'s
|