PubWorks Occupancy Approval | 3/22/2017 | 3/22/2017 | 3/22/2017 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 9/30/2015 | 9/30/2015 | 9/30/2015 | P | PASS |
Troy Cobbley
|
|
|
No signoff required for life safety
|
Plan assigned to (CEV) Carlos | 7/2/2015 | | 7/16/2015 | | DONE |
Carlos Velazquez
|
|
|
|
Routing - PLAN CHECK | | | 7/16/2015 | | PASS |
Carlos Velazquez
|
|
|
|
Routing - PLAN CHECK | 7/15/2015 | | 7/16/2015 | | PASS |
Carlos Velazquez
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2015 | | |
|
|
|
|
Telephone call | | | 7/16/2015 | | DONE |
|
|
|
left a message with Matt (Matter Architecture), informing him that we need a #302 form filled out by the owner who is performing the work
|
Inspection Record Card-GRD | | | 7/16/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/16/2015 | | DONE |
|
|
|
Need #302 Form from the owner as he is performing the work
|
Inspection Record Card-GRD | | | 7/16/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/16/2015 | | DONE |
|
|
|
|
Routing - FIRE | 7/14/2015 | 7/2/2015 | 7/15/2015 | | PASS |
Scott Arellano
|
|
|
No Comments
|
1st review completed | | | 7/15/2015 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 7/13/2015 | | 7/14/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(TOWN & COUNTRY PARKING LOT) Permit to excavate, grade, and pave a parking lot per engineered plans on file as approved by Public Works Department. Install curbing and striping as noted on plans. Electrical permit required for site lighting. No buildings are to be constructed or installed under this permit.
|
Routing PW Drainage | 7/7/2015 | | 7/13/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 7/7/2015 | | 7/13/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Design Review | 7/13/2015 | | 7/13/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing - Addressing | 7/2/2015 | | 7/7/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLANNING Land Div | 7/2/2015 | | 7/2/2015 | | PASS |
Dave Abo
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/2/2015 | | DONE |
|
|
|
|
Intake Approval | | | 7/2/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/2/2015 | | DONE |
|
|
|
|
Application received | | 7/1/2015 | | | |
|
|
|
|