PubWorks Occupancy Approval | 9/21/2017 | 9/21/2017 | 9/21/2017 | | DONE |
Tiffany Lowery
|
|
|
|
PubWorks Occupancy Approval | 1/18/2017 | 1/18/2017 | 1/18/2017 | | DONE |
Tiffany Lowery
|
|
|
|
GRD-Conference | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Dave Hannah
|
|
|
Needing to go through some fire proofing issues and blocking/ backing in walls. thanks, Phone #: ###-#### Inspection requested via web by Mike Beeson
|
GRD-Conference | 10/23/2015 | 10/23/2015 | 10/23/2015 | P | PEND |
Dave Hannah
|
|
|
Mayors Hot Line complaint received from adjacent property owner John Holland that contractor has constructed a fence on his property, removed trees and also damaged a sprinkler line. Spoke with Carl, general contractor ESI and Patrick the adjacent tenant on concerns also followed up with Mr. Holland and Jeff in the mayors office. Adjacent property owners will negotiate for repairs to sprinkler line, encroachment onto property with construction fencing and the removal of trees growing on property line.
|
Issue PAID IN FULL permit | | | 10/14/2015 | | DONE |
|
|
|
|
Routing PW Geothermal | 9/29/2015 | | 9/29/2015 | | PASS |
Jon R. Gunnerson
|
|
|
Per Jon Gunnerson; not using geothermal.
|
Routing - PLAN CHECK | 9/29/2015 | | 9/29/2015 | | PASS |
Christina Prado
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2015 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 9/29/2015 | | DONE |
|
|
|
**MET 10-14-15 BLH** need RP, GC & rev cert of val
|
Plan assigned to Christina | 9/14/2015 | | 9/29/2015 | | DONE |
Christina Prado
|
|
|
Pending PW Geo thermal approval/// no Geothermal being used
|
Routing - PLAN CHECK | 9/14/2015 | | 9/25/2015 | | FAIL |
Christina Prado
|
|
|
Needs GEo thermal revisions
|
Routing PW Drainage | 9/14/2015 | | 9/25/2015 | | PASS |
Brian Murphy
|
|
|
Per eplan approval
|
Routing PW Street Lights | 9/14/2015 | | 9/24/2015 | | PASS |
Rob Bousfield
|
|
|
Per ePlan approval
|
Routing PW Environmental | 9/14/2015 | | 9/24/2015 | | PASS |
Rick Christenson
|
|
|
|
Routing - FIRE | 9/14/2015 | 9/14/2015 | 9/17/2015 | | PASS |
Scott Arellano
|
|
|
Plans were reviewed for fire department vehicle access.
|
Routing PW Sewer Design | 9/14/2015 | | 9/16/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLUMBING | 9/14/2015 | | 9/16/2015 | | PASS |
Daryl Spivey
|
|
|
per plans ad ISPC
|
Routing - PLANNING Land Div | 9/14/2015 | | 9/16/2015 | | PASS |
Dave Abo
|
|
|
|
Routing - Design Review | 9/14/2015 | | 9/15/2015 | | PASS |
Sarah Schafer
|
|
|
per eplan approval
|
Routing - Erosion and Sediment | 9/14/2015 | | 9/15/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
The scope of work for this permit includes demolition of existing site amenities, including but not limited to the demolition and removal of existing asphalt parking lot, associated parking signs, existing site lighting and associated electrical work. Proposed new construction to include site rough grading and underground seepage beds for drainage with utility stub ups for future Hotel and parking structure.
|
Routing PW Geothermal | 9/14/2015 | | 9/14/2015 | | FAIL |
Jon R. Gunnerson
|
|
|
Geothermal Service Application required. Plans show a single service line, change to supply and collection. City will extend service line to edge of right-of-way. Jon Gunnerson ###-####
|
Routing - Addressing | 9/14/2015 | | 9/14/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 9/14/2015 | | 9/14/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Intake Approval | | | 9/14/2015 | | FAIL |
Christina Prado
|
|
|
Need Solis & GeoTech reports
|
Plans ACCEPTED BY PLAN TECH | | | 9/14/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 9/14/2015 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/14/2015 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 9/11/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 11 2015 3:29PM
|
GRD-Conference | 6/30/2016 | 6/30/2016 | | P | |
|
|
|
Dave, we want to revisit the blocking requirements and fire proofing of our structural steel. please call to set up a time that we can sit down and discuss so we are all on the same page before this work starts. Thanks Phone #: ###-#### >> Inspection requested via web by Mike Beeson
|
GRD-Conference | 6/22/2016 | 6/23/2016 | | P | |
|
|
|
2nd floor corridor lid framing. Electrical inspection is set for the am. Thanks, Phone #: ###-#### >> Inspection requested via web by Mike Beeson
|