Permit Information
Permit NumberGRD15-00068
StatusIssued
Name ESI
Site Address 500 S CAPITOL BLVD
Project NameInn at 500
Customer NumberDRH15-00337
ePlanReviewYes
Description
(INN AT 500) - Grading permit to excavate, grade and compact site earth materials in preparation for a new shell hotel building to be constructed at a later date. All work to be performed as approved by the Public Works Department 9/ /2015. Planning & Zoning Approval as per DRH15-00337. Underground utilities only, no buildings or footings are allowed to be constructed under this permit. (C_P)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval9/21/20179/21/20179/21/2017 DONE
DetailsTiffany Lowery
PubWorks Occupancy Approval1/18/20171/18/20171/18/2017 DONE
DetailsTiffany Lowery
GRD-Conference6/30/20167/1/20167/1/2016APASS
DetailsDave Hannah
Needing to go through some fire proofing issues and blocking/ backing in walls.
thanks, Phone #: ###-#### Inspection requested via web by Mike Beeson
GRD-Conference10/23/201510/23/201510/23/2015PPEND
DetailsDave Hannah
Mayors Hot Line complaint received from adjacent property owner John Holland that contractor has constructed a fence on his property, removed trees and also damaged a sprinkler line. Spoke with Carl, general contractor ESI and Patrick the adjacent tenant on concerns also followed up with Mr. Holland and Jeff in the mayors office. Adjacent property owners will negotiate for repairs to sprinkler line, encroachment onto property with construction fencing and the removal of trees growing on property line.
Issue PAID IN FULL permit  10/14/2015 DONE
Routing PW Geothermal9/29/2015 9/29/2015 PASS
DetailsJon R. Gunnerson
Per Jon Gunnerson; not using geothermal.
Routing - PLAN CHECK9/29/2015 9/29/2015 PASS
DetailsChristina Prado
PLANS/APPL TAKEN TO FRONT DESK  9/29/2015 DONE
DetailsChristina Prado
Permit Ready to Issue  9/29/2015 DONE
**MET 10-14-15 BLH** need RP, GC & rev cert of val
Plan assigned to Christina9/14/2015 9/29/2015 DONE
DetailsChristina Prado
Pending PW Geo thermal approval/// no Geothermal being used
Routing - PLAN CHECK9/14/2015 9/25/2015 FAIL
DetailsChristina Prado
Needs GEo thermal revisions
Routing PW Drainage9/14/2015 9/25/2015 PASS
DetailsBrian Murphy
Per eplan approval
Routing PW Street Lights9/14/2015 9/24/2015 PASS
DetailsRob Bousfield
Per ePlan approval
Routing PW Environmental9/14/2015 9/24/2015 PASS
DetailsRick Christenson
Routing - FIRE9/14/20159/14/20159/17/2015 PASS
DetailsScott Arellano
Plans were reviewed for fire department vehicle access.
Routing PW Sewer Design9/14/2015 9/16/2015 PASS
DetailsKyle S. Rosenmeyer
Routing - PLUMBING9/14/2015 9/16/2015 PASS
DetailsDaryl Spivey
per plans ad ISPC
Routing - PLANNING Land Div9/14/2015 9/16/2015 PASS
DetailsDave Abo
Routing - Design Review9/14/2015 9/15/2015 PASS
DetailsSarah Schafer
per eplan approval
Routing - Erosion and Sediment9/14/2015 9/15/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

The scope of work for this permit includes demolition of existing site amenities, including but not limited to the demolition and removal of existing asphalt parking lot, associated parking signs, existing site lighting and associated electrical work. Proposed new construction to include site rough grading and underground seepage beds for drainage with utility stub ups for future Hotel and parking structure.
Routing PW Geothermal9/14/2015 9/14/2015 FAIL
DetailsJon R. Gunnerson
Geothermal Service Application required. Plans show a single service line, change to supply and collection. City will extend service line to edge of right-of-way. Jon Gunnerson ###-####
Routing - Addressing9/14/2015 9/14/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS9/14/2015 9/14/2015 PASS
DetailsJennifer Bruner
Intake Approval  9/14/2015 FAIL
DetailsChristina Prado
Need Solis & GeoTech reports
Plans ACCEPTED BY PLAN TECH  9/14/2015 DONE
DetailsChristina Prado
Intake Approval  9/14/2015 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  9/14/2015 DONE
DetailsChristina Prado
Application received  9/11/2015 DONE
Application submitted via PDS Online on Sep 11 2015 3:29PM
GRD-Conference6/30/20166/30/2016 P 
Details
Dave, we want to revisit the blocking requirements and fire proofing of our structural steel. please call to set up a time that we can sit down and discuss so we are all on the same page before this work starts. Thanks Phone #: ###-#### >> Inspection requested via web by Mike Beeson
GRD-Conference6/22/20166/23/2016 P 
Details
2nd floor corridor lid framing. Electrical inspection is set for the am. Thanks, Phone #: ###-#### >> Inspection requested via web by Mike Beeson