GRD-Final | 5/16/2016 | 5/16/2016 | 5/16/2016 | P | PASS |
Jim Storey
|
|
|
|
PubWorks Occupancy Approval | 5/13/2016 | 5/13/2016 | 5/13/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Routing - PLAN CHECK | 2/2/2016 | | 2/5/2016 | | PASS |
Christina Prado
|
|
|
|
Routing PW Sewer Design | 2/2/2016 | | 2/5/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Per Mike Sheppard's approval in ePlan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2016 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/5/2016 | | DONE |
Christina Prado
|
|
|
No additional fees due for plan modification
|
Routing - PLUMBING | 2/2/2016 | | 2/2/2016 | | PASS |
Bill VanDegrift
|
|
|
sewer rerout ok
|
Routing - PUBLIC WORKS | 2/2/2016 | | 2/2/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Plan Modification Accepted | | | 2/2/2016 | | DONE |
Christina Prado
|
|
|
PLan Mod started to show changes to the sewer line placement for Plumbing & Public Works approval
|
Issue PAID IN FULL permit | | | 1/15/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/15/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/8/2016 | | DONE |
Christina Prado
|
|
|
***MET 1-15-16*** ***still needs GC Form & Rev cert of value 1-15-16 /CEV
Need RP, GC Form & Revised certificate of value for issuance
|
Plan assigned to (KRS) Kristal | 12/15/2015 | | 1/8/2016 | | DONE |
Kristal Soland
|
|
|
|
Routing - PLAN CHECK | 12/15/2015 | | 1/8/2016 | | PASS |
Kristal Soland
|
|
|
|
Routing - ELECTRICAL | 12/15/2015 | | 1/7/2016 | | PASS |
Christina Prado
|
|
|
Review not required
|
Routing PW Environmental | 12/15/2015 | | 1/7/2016 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Drainage | 1/7/2016 | | 1/7/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 12/15/2015 | | 1/6/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Solid Waste | 12/15/2015 | | 1/5/2016 | | PASS |
Megan Durrell
|
|
|
|
Routing - Addressing | 12/15/2015 | | 1/4/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - Design Review | 12/31/2015 | | 12/31/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing PW Drainage | 12/15/2015 | | 12/29/2015 | | FAIL |
Brian Murphy
|
|
|
pond slopes should be 3 to 1
|
Routing - PLUMBING | 12/15/2015 | | 12/18/2015 | | PASS |
Bill VanDegrift
|
|
|
1) vent interceptor
2) water crossing sewer must be in acordance with the ISPC
inside th ebuilding
1) aditional cross connection may be required
|
Routing - FIRE | 12/15/2015 | 12/15/2015 | 12/16/2015 | | PASS |
Katie Marron
|
|
|
Plans reviewed for fire department vehicle access. During grading work, the fire hydrant along Broadway shall be protected and remain accessible.
|
Routing PW Street Lights | 12/15/2015 | | 12/16/2015 | | PASS |
Mike D Hedge
|
|
|
No ne street lighting required.
|
Application received | | | 12/15/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 15 2015 8:16AM
|
Plans ACCEPTED BY PLAN TECH | | | 12/15/2015 | | DONE |
|
|
|
|
Intake Approval | | | 12/15/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/15/2015 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 12/15/2015 | | 12/15/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PLANNING Land Div | 12/15/2015 | | 12/15/2015 | | PASS |
Dave Abo
|
|
|
|
Routing - Erosion and Sediment | 12/15/2015 | | 12/15/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Grading permit to excavate, grade and compact site earth materials in preparation for a new shell building to be constructed under BLD15-04318. Work to include paving existing dirt lot, asphalt paving, landscaping, site lighting improvements, install curbing and striping
|
Routing - Design Review | 12/15/2015 | | | | FAIL |
Andrea Tuning
|
|
|
Install the required Class II or Class III tree with low shrubs or other vegetative groundcover in the two planter islands adjacent to Broadway Avenue.
|
Plan assigned to Christina | 2/2/2016 | | | | |
Christina Prado
|
|
|
|