GRD-Final | 6/7/2017 | 6/8/2017 | 6/8/2017 | A | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-####
|
GRD-Final | 12/21/2016 | 12/22/2016 | 12/22/2016 | A | CANC |
Mike Jordan
|
|
|
James Phone #: ###-####
|
Routing - Erosion and Sediment | 11/23/2016 | | 11/23/2016 | | PASS |
Andy J. Long
|
|
|
New ESC plan submitted and approved. New RP with different contractor identified.,
|
Issue PAID IN FULL permit | | | 5/3/2016 | | DONE |
|
|
|
|
Plan assigned to (CEV) Carlos | 4/29/2016 | | 5/2/2016 | | DONE |
Carlos Velazquez
|
|
|
review is complete
|
Routing - PLAN CHECK | | | 5/2/2016 | | PASS |
Carlos Velazquez
|
|
|
resubmittals have been approved
|
Routing PW Drainage | 4/29/2016 | | 5/2/2016 | | PASS |
Brian Murphy
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/2/2016 | | DONE |
|
|
|
***all requirments met 5-3-16 /CEV
Need; GC Form & Revised Cert of Value
|
Telephone call | | | 5/2/2016 | | DONE |
|
|
|
notified applicant that permit is ready
|
Routing - FIRE | 4/28/2016 | 4/19/2016 | 4/29/2016 | | PASS |
Katie Marron
|
|
|
Plans reviewed for FD Access. A gate is shown at entrance to lot. Chains and locks shall not be of such quality so as not to damage fire department cutting tools nor shall cutting operations result in any unnecessary time delay. No additional comments required.
|
Plan assigned to (CEV) Carlos | 4/19/2016 | | 4/29/2016 | | DONE |
Carlos Velazquez
|
|
|
review is finished
|
Routing - PLAN CHECK | 4/29/2016 | | 4/29/2016 | | PASS |
Carlos Velazquez
|
|
|
all departments have passed their respective review
|
1st review completed | | | 4/29/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/29/2016 | | DONE |
|
|
|
Needs: GC Form, Rev Cert of Value
|
Inspection Record Card-GRD | | | 4/29/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/29/2016 | | DONE |
|
|
|
received (2) sets of O&M reports
|
Routing - Erosion and Sediment | 4/27/2016 | | 4/28/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(WESTSIDE BODY WORKS- OUTDOOR STORAGE YARD) - Grading permit to excavate, grade and compact site earth materials in preparation for a new shell building to be constructed under BLD . All work to be performed as approved by the Public Works Department and Planning & Zoning Department
|
Routing - Design Review | 4/27/2016 | | 4/28/2016 | | PASS |
Andrea Tuning
|
|
|
DRH16-00029
|
Routing - PUBLIC WORKS | 4/19/2016 | | 4/27/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 4/19/2016 | | 4/26/2016 | | PASS |
Brian Murphy
|
|
|
SOILS BIORETENTION.
|
Routing - PLANNING Land Div | 4/19/2016 | | 4/19/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 4/19/2016 | | 4/19/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/19/2016 | | DONE |
|
|
|
|
Intake Approval | | | 4/19/2016 | | PASS |
|
|
|
as per Brian Murphy
|
Recd Pcfee & Taken To Pln CK | | | 4/19/2016 | | DONE |
|
|
|
|
Application received | | 4/15/2016 | | | |
|
|
|
|