FIRE-Final Inspection | 9/28/2016 | 9/29/2016 | 9/29/2016 | A | PASS |
Troy Cobbley
|
|
|
?Life safety passed. Scott Arellano approved the traffic calming devices and the less than 20' clearance at the west side of the school. I could not contact the contractor due to wrong number posted. Scott provided plans via email. Steve Phone #: ###-####
|
Routing PW Drainage | 6/29/2016 | | 7/7/2016 | | PASS |
Brian Murphy
|
|
|
Per ePlan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/7/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/7/2016 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Issue PAID IN FULL permit | | | 7/7/2016 | | DONE |
|
|
|
|
Inspection Record Card-GRD | | | 7/7/2016 | | DONE |
|
|
|
|
Plan assigned to Christina | 6/29/2016 | | 7/7/2016 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 6/29/2016 | | 7/7/2016 | | PASS |
Christina Prado
|
|
|
|
Routing - PLANNING | 6/29/2016 | | 7/7/2016 | | PASS |
Celine Acord
|
|
|
CZC16-00175
|
Routing - PLANNING Land Div | 6/29/2016 | | 7/1/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - FIRE | 6/29/2016 | 6/29/2016 | 6/29/2016 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for FD Access and water availability. Existing fire hydrants shall be protected during construction.
|
Plans ACCEPTED BY PLAN TECH | | | 6/29/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/29/2016 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/29/2016 | | DONE |
Christina Prado
|
|
|
|
Routing - Addressing | 6/29/2016 | | 6/29/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/29/2016 | | 6/29/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 6/29/2016 | | 6/29/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(Pioneer Elementary) Permit to excavate, grade, and pave a parking lot per engineered plans on file as approved by Public Works Department. Work to include: demolition and reconstruction of existing landscape, asphalt and concrete. Also, pressurized irrigation will be installed during the road reconstruction and landscaping process. The lines will be trenched from the street and continue to the back of the commercial parcel lot. Upon completion of installation the trench will be backfilled and compacted. Install curbing, sidewalk, gutter and striping as noted on plans. No buildings are to be constructed or installed under this permit.
|
Application received | | | 6/17/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 17 2016 4:27PM
|