Description
(Dillon RV Paving Targee Street) - Grading permit to pave existing dirt lot, work to include asphalt paving, landscaping, site lighting improvements, & storm water management per engineered plans approved by the Public Works Department. No buildings are to be constructed or installed under this permit. See DRH16-00190 for zoning approval/// (CAN)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Zoning Approval10/11/201710/11/201710/11/2017 PASS
DetailsSarah Schafer
Override - Parcel Holds  10/11/2017  
Change Expiration Date Only  6/13/2017 DONE
DetailsJason Blais
2 extensions approved.
PubWorks Occupancy Approval12/22/201612/22/201612/22/2016 DONE
DetailsJason C. Taylor
Project complete for PW Approval. JCT
Override - Parcel Holds  12/22/2016  
GRD-Final12/13/201612/14/201612/14/2016PNR
DetailsMike Jordan
Ty Phone #: ###-####. Spoke with Ty on the phone. Noted that Ty that he nned public works and zoning finals. Also Ty to send me a final letter from the special inspection agency.
Issue PAID IN FULL permit  10/21/2016 DONE
Inspection Record Card-GRD  10/21/2016 DONE
Plan resubmittals received  10/19/2016 DONE
resubmittals received thru e plan review assigned to Brian Murphy and Josh Wilson
PLANS/APPL TAKEN TO FRONT DESK  10/19/2016 DONE
DetailsCandy A. Nichols
Override - Parcel Holds  10/19/2016  
Permit Ready to Issue  10/19/2016 DONE
***all requirments met 10-20-16 /CEV

***still needs; GC Form & Rev cert of value

Need GC, RP & rec cert of val
Routing - Design Review10/19/2016 10/19/2016 PASS
DetailsJosh Wilson
Routing PW Drainage10/19/2016 10/19/2016 PASS
DetailsBrian Murphy
Plan assigned to (CAN) Candy7/28/2016 10/19/2016 DONE
DetailsCandy A. Nichols
Routing - PLAN CHECK7/28/2016 10/19/2016 PASS
DetailsCandy A. Nichols
Plan resubmittals received  10/7/2016 DONE
App J was brought in-took to Brian Murphy
Telephone call  10/6/2016 DONE
Chad called and said they were still working on the resubmittals. They started a new DRH for some changes they made-then they will resubmitl
Telephone call  10/5/2016 DONE
called Carl Geiger-just wanted to know if he knew the plans failed and that we need revisions in order to proceed-left message on his phone
Plan resubmittals received  10/3/2016 DONE
resubmittal received the Permanent operation and maintenance (Appendex J)-took to Brian Murphy
Routing PW Drainage8/16/2016 8/31/2016 FAIL
DetailsBrian Murphy
NEED NEW APDX J NOT OLD VERSION
Routing - Design Review8/22/2016 8/22/2016 FAIL
DetailsAndrea Tuning
Install 2 bicycle parking stalls that are located near the buildings main entrance, convenient and visible to individuals utilizing alternative transportation.
Install 18 Class II or Class III trees along Interstate I-84.
Install two new planter islands that are a minimum of 8-feet in width (measured inside of curb to inside of curb) and install the required Class II or Class III tree with low shrubs or other vegetative groundcover that will flank the storm basin on the west side of the site.
Install Class II or Class III tree with low shrubs or other vegetative groundcover within each of the planter islands throughout the site.
Design the storm basin to not exceed 18 inches in storage depth, the gravel, rock, or cobble surface of swales shall not exceed 20 percent of the surface area of the bottom of the swale and all swales shall be vegetated with appropriate plant materials.
All light poles and fixtures shall be located outside of landscape planters which contain trees as required by the landscape ordinance.
Routing - Design Review8/15/2016 8/16/2016 FAIL
DetailsAndrea Tuning
Routing - Design Review8/16/2016 8/16/2016 FAIL
DetailsAndrea Tuning
Routing PW Drainage8/15/2016 8/15/2016 FAIL
DetailsBrian Murphy
call Jim Wyllie for needed corrections.
Routing PW Drainage7/28/2016 8/1/2016 FAIL
DetailsBrian Murphy
NEED TO CC AND R 'S FOR GILLWOOD DRAINAGE
Routing - PLANNING Land Div7/28/2016 8/1/2016 PASS
DetailsTodd Tucker
Routing - Addressing7/28/2016 7/29/2016 PASS
DetailsLaura Hunter
Routing PW Street Lights7/28/2016 7/29/2016 PASS
DetailsTom Marshall
Routing - Erosion and Sediment7/28/2016 7/29/2016 PASS
DetailsAndy J. Long
ESC narrative and site map are approved. Valid PD, RP to be designated.
Routing - FIRE7/28/20167/28/20167/28/2016 PASS
DetailsKatie Marron
No comments required.
Routing - PUBLIC WORKS7/28/2016 7/28/2016 PASS
DetailsRachael Beierle
Routing - Design Review7/28/2016 7/28/2016 FAIL
DetailsAndrea Tuning
Plans ACCEPTED BY PLAN TECH  7/28/2016 DONE
Intake Approval  7/28/2016 PASS
Override - Parcel Holds  7/28/2016  
Recd Pcfee & Taken To Pln CK  7/28/2016 DONE
erosion permit fees paid
Application received  7/15/2016 DONE
Application submitted via PDS Online on Jul 15 2016 3:02PM