Zoning Approval | 10/11/2017 | 10/11/2017 | 10/11/2017 | | PASS |
Sarah Schafer
|
|
|
|
Override - Parcel Holds | | | 10/11/2017 | | |
|
|
|
|
Change Expiration Date Only | | | 6/13/2017 | | DONE |
Jason Blais
|
|
|
2 extensions approved.
|
PubWorks Occupancy Approval | 12/22/2016 | 12/22/2016 | 12/22/2016 | | DONE |
Jason C. Taylor
|
|
|
Project complete for PW Approval. JCT
|
Override - Parcel Holds | | | 12/22/2016 | | |
|
|
|
|
GRD-Final | 12/13/2016 | 12/14/2016 | 12/14/2016 | P | NR |
Mike Jordan
|
|
|
Ty Phone #: ###-####. Spoke with Ty on the phone. Noted that Ty that he nned public works and zoning finals. Also Ty to send me a final letter from the special inspection agency.
|
Issue PAID IN FULL permit | | | 10/21/2016 | | DONE |
|
|
|
|
Inspection Record Card-GRD | | | 10/21/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/19/2016 | | DONE |
|
|
|
resubmittals received thru e plan review assigned to Brian Murphy and Josh Wilson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/19/2016 | | DONE |
Candy A. Nichols
|
|
|
|
Override - Parcel Holds | | | 10/19/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 10/19/2016 | | DONE |
|
|
|
***all requirments met 10-20-16 /CEV
***still needs; GC Form & Rev cert of value
Need GC, RP & rec cert of val
|
Routing - Design Review | 10/19/2016 | | 10/19/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing PW Drainage | 10/19/2016 | | 10/19/2016 | | PASS |
Brian Murphy
|
|
|
|
Plan assigned to (CAN) Candy | 7/28/2016 | | 10/19/2016 | | DONE |
Candy A. Nichols
|
|
|
|
Routing - PLAN CHECK | 7/28/2016 | | 10/19/2016 | | PASS |
Candy A. Nichols
|
|
|
|
Plan resubmittals received | | | 10/7/2016 | | DONE |
|
|
|
App J was brought in-took to Brian Murphy
|
Telephone call | | | 10/6/2016 | | DONE |
|
|
|
Chad called and said they were still working on the resubmittals. They started a new DRH for some changes they made-then they will resubmitl
|
Telephone call | | | 10/5/2016 | | DONE |
|
|
|
called Carl Geiger-just wanted to know if he knew the plans failed and that we need revisions in order to proceed-left message on his phone
|
Plan resubmittals received | | | 10/3/2016 | | DONE |
|
|
|
resubmittal received the Permanent operation and maintenance (Appendex J)-took to Brian Murphy
|
Routing PW Drainage | 8/16/2016 | | 8/31/2016 | | FAIL |
Brian Murphy
|
|
|
NEED NEW APDX J NOT OLD VERSION
|
Routing - Design Review | 8/22/2016 | | 8/22/2016 | | FAIL |
Andrea Tuning
|
|
|
Install 2 bicycle parking stalls that are located near the buildings main entrance, convenient and visible to individuals utilizing alternative transportation.
Install 18 Class II or Class III trees along Interstate I-84.
Install two new planter islands that are a minimum of 8-feet in width (measured inside of curb to inside of curb) and install the required Class II or Class III tree with low shrubs or other vegetative groundcover that will flank the storm basin on the west side of the site.
Install Class II or Class III tree with low shrubs or other vegetative groundcover within each of the planter islands throughout the site.
Design the storm basin to not exceed 18 inches in storage depth, the gravel, rock, or cobble surface of swales shall not exceed 20 percent of the surface area of the bottom of the swale and all swales shall be vegetated with appropriate plant materials.
All light poles and fixtures shall be located outside of landscape planters which contain trees as required by the landscape ordinance.
|
Routing - Design Review | 8/15/2016 | | 8/16/2016 | | FAIL |
Andrea Tuning
|
|
|
|
Routing - Design Review | 8/16/2016 | | 8/16/2016 | | FAIL |
Andrea Tuning
|
|
|
|
Routing PW Drainage | 8/15/2016 | | 8/15/2016 | | FAIL |
Brian Murphy
|
|
|
call Jim Wyllie for needed corrections.
|
Routing PW Drainage | 7/28/2016 | | 8/1/2016 | | FAIL |
Brian Murphy
|
|
|
NEED TO CC AND R 'S FOR GILLWOOD DRAINAGE
|
Routing - PLANNING Land Div | 7/28/2016 | | 8/1/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 7/28/2016 | | 7/29/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing PW Street Lights | 7/28/2016 | | 7/29/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing - Erosion and Sediment | 7/28/2016 | | 7/29/2016 | | PASS |
Andy J. Long
|
|
|
ESC narrative and site map are approved. Valid PD, RP to be designated.
|
Routing - FIRE | 7/28/2016 | 7/28/2016 | 7/28/2016 | | PASS |
Katie Marron
|
|
|
No comments required.
|
Routing - PUBLIC WORKS | 7/28/2016 | | 7/28/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 7/28/2016 | | 7/28/2016 | | FAIL |
Andrea Tuning
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/28/2016 | | DONE |
|
|
|
|
Intake Approval | | | 7/28/2016 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 7/28/2016 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/28/2016 | | DONE |
|
|
|
erosion permit fees paid
|
Application received | | | 7/15/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 15 2016 3:02PM
|