Permit Information
Permit NumberGRD16-00067
StatusFinaled
Name TALBOY CONSTRUCTION
Site Address 12463 W FAIRVIEW AVE
Project NameMaverick Car Company
Customer Number 
ePlanReviewYes
Description
(MAVERICK CAR COMPANY) - Grading permit to excavate, grade and compact site earth materials in preparation for a new shell building to be constructed under BLD16-02889. All work to be performed as approved by the Public Works Department and Planning & Zoning Department under DRH16-00131. Underground utilities only, no buildings or footings are allowed to be constructed under this permit. (CEV)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GRD-Final7/26/20177/27/20177/27/2017ADONE
DetailsAndy J. Long
Dick Phone #: ###-####
FIRE-Final Inspection7/26/20177/26/20177/26/2017PPASS
DetailsTroy Cobbley
Life safety passed

Dick Phone #: ###-####
PubWorks Occupancy Approval7/25/20177/25/20177/25/2017 DONE
DetailsTiffany Lowery
Meeting  10/6/2016 DONE
plans were found in Carl M's office-he's not sure why-i called Brian Murphy to see if he wanted a set-he said no he didn't want a paper set-see eplan for drawings
PLANS/APPL TAKEN TO FRONT DESK  9/16/2016 DONE
Permit Ready to Issue  9/16/2016 DONE
Issue PAID IN FULL permit  9/16/2016 DONE
Routing - PLAN CHECK9/15/2016 9/16/2016 PASS
DetailsCarlos Velazquez
all applicable reviews have been completed
Plan assigned to (CEV) Carlos8/9/2016 9/16/2016 DONE
DetailsCarlos Velazquez
review is complete
Routing - FIRE9/15/20169/15/20169/15/2016 PASS
DetailsKatie Marron
No revised comments required.
Routing PW Drainage9/15/2016 9/15/2016 PASS
DetailsBrian Murphy
Routing PW Sewer Design9/15/2016 9/15/2016 PASS
DetailsKyle S. Rosenmeyer
Approval deferred to building permit, per note on the grading permit sewer plan.
Plan resubmittals received  9/15/2016 DONE
resubmittals have been submitted
Routing - PLUMBING8/31/2016 9/14/2016 PASS
DetailsBill VanDegrift
notes in eplanreview
Routing PW Sewer Design8/31/2016 9/14/2016 FAIL
DetailsKyle S. Rosenmeyer
Currently reviewing public sewer extension in Public Works.
Plan resubmittals requested  9/14/2016 DONE
email with corrections needed has been sent
Routing - PLAN CHECK8/31/2016 9/14/2016 FAIL
DetailsCarlos Velazquez
required departments have failed the review
Routing - FIRE8/31/20168/31/20169/1/2016 FAIL
DetailsKatie Marron
Updated comments attached to case.
Routing - Design Review8/31/2016 8/31/2016 PASS
DetailsAndrea Tuning
Plan resubmittals received  8/31/2016 DONE
resubmittals have been uploaded
1st review completed  8/22/2016 FAIL
resubmittals required
Routing - PLAN CHECK8/9/2016 8/22/2016 FAIL
DetailsCarlos Velazquez
corrections needed
Routing - PLANNING Land Div8/9/2016 8/18/2016 PASS
DetailsTodd Tucker
Routing PW Environmental8/9/2016 8/18/2016 PASS
DetailsRick Christenson
Routing PW Drainage8/9/2016 8/17/2016 PASS
DetailsBrian Murphy
need apdx j for bld approval
Routing PW Sewer Design8/9/2016 8/15/2016 FAIL
DetailsKyle S. Rosenmeyer
Separate submittal to Boise Public Works required to review and approve extension of public sewer. Contact Kyle Rosenmeyer or send drawing to sewerreview@cityofboise.org.
Routing - PLUMBING8/9/2016 8/12/2016 FAIL
DetailsBill VanDegrift
1) lift station needs to discharge below grade.
2) address lift station venting
3) duel pumps required at lift station.
4) show lift station venting
5) provide interceptor detail
Routing PW Street Lights8/9/2016 8/10/2016 PASS
DetailsTom Marshall
Routing - FIRE8/9/20168/9/20168/9/2016 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
Routing PW Solid Waste8/9/2016 8/9/2016 PASS
DetailsPeter J. McCullough
Final approval of enclosure will be with BLD.
Routing - Addressing8/9/2016 8/9/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS8/9/2016 8/9/2016 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment8/9/2016 8/9/2016 PASS
DetailsAndy J. Long
ESC plan approved. Valid PD and RP designated. ESC site preparation inspection is required.
Routing - Design Review8/9/2016 8/9/2016 FAIL
DetailsAndrea Tuning
DRH16-00131
Site Plan and Landscape Plan should match and include:
Provide a 7-foot setback from the east and west property

Provide a minimum of 2 bicycle parking stalls on the site that are located in a visible location to individuals utilizing modes of alternative transportation.

Install nine Class II or Class III trees along Fairview Avenue. If any utility easement precludes trees required by this section, the width of the required buffer shall be increased to accommodate the required trees.

Install planter islands that are a minimum of 8-feet in width (measured inside of curb to inside of curb) and install the required Class II or Class III tree with low shrubs or other vegetative groundcover within the two planter islands that flank the trash enclosure.

Provide an easement for the shared access drive aisle located approximately 280-feet from the front property line. It will be required to remain open from the east property line to the west property line when the parcels to the east and/or west develop.
Plans ACCEPTED BY PLAN TECH  8/9/2016 DONE
Intake Approval  8/9/2016 PASS
Recd Pcfee & Taken To Pln CK  8/9/2016 DONE
Application received  8/6/2016 DONE
Application submitted via PDS Online on Aug 6 2016 9:48AM