GRD-Final | 4/11/2018 | 4/11/2018 | 4/11/2018 | A | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 12/18/2017 | 12/18/2017 | 12/18/2017 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per Scott Arellano since the plans have been misplaced the fire dept access and the two fire hydrants could be verified from the civil sheets of the project approved building permit plans.
|
FIRE-Final Inspection | 12/17/2017 | 12/18/2017 | 12/18/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per Scott Arellano since the plans have been misplaced the fire dept access and the two fire hydrants could be verified from the civil sheets of the project approved building permit plans.
Phone #: ###-#### Inspection requested via web by David Scaggs
|
FIRE-Final Inspection | 12/14/2017 | 12/15/2017 | 12/15/2017 | A | FAIL |
Troy Cobbley
|
|
|
No city approved plans or small documents. No inspection was performed
Phone #: ###-#### Inspection requested via web by David Scaggs
|
Issue PAID IN FULL permit | | | 10/28/2016 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 10/7/2016 | | 10/12/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 10/7/2016 | | 10/12/2016 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/12/2016 | | 10/12/2016 | | PASS |
Carlos Velazquez
|
|
|
all applicable departments have signed off on the review
|
Routing - PLANNING | 10/11/2016 | | 10/12/2016 | | PASS |
Cody Riddle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/12/2016 | | DONE |
|
|
|
all requirments met
needs; GC Form, Revised Cert of Value, RP
|
Telephone call | | | 10/12/2016 | | DONE |
|
|
|
notified the customer that the permit is ready
|
Inspection Record Card-GRD | | | 10/12/2016 | | DONE |
|
|
|
|
Inspection Record Card-GRD | | | 10/12/2016 | | DONE |
|
|
|
|
Plan assigned to (CEV) Carlos | 8/31/2016 | | 10/12/2016 | | DONE |
Carlos Velazquez
|
|
|
all reviews have been completed
|
Routing PW Drainage | 9/14/2016 | | 10/7/2016 | | CANC |
Brian McGowan
|
|
|
new resubmittals have been turned in 10-7-16----> routing has been re-entered on that date
|
Plan resubmittals received | | | 10/7/2016 | | DONE |
|
|
|
received (2) sets of O&M manuals
|
1st review completed | | | 9/16/2016 | | DONE |
|
|
|
review has failed
|
Telephone call | | | 9/16/2016 | | DONE |
|
|
|
notified customer that resubmittals are required
|
Routing - PLAN CHECK | | | 9/16/2016 | | FAIL |
Carlos Velazquez
|
|
|
failed to get the proper approvals
|
Routing - FIRE | 9/14/2016 | 8/31/2016 | 9/15/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to plans
|
Plan resubmittals received | | | 9/14/2016 | | DONE |
|
|
|
received (2) sets of shallow injection well inventory form
|
Routing - Erosion and Sediment | 9/13/2016 | | 9/14/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(MARINA APARTMENTS) - Grading permit to excavate, grade and compact site earth materials in preparation for a new shell building to be constructed under BLD . All work to be performed as approved by the Public Works Department and Planning & Zoning Department under PUD16-00007. Underground utilities only, no buildings or footings are allowed to be constructed under this permit.
|
Routing - PLANNING | 9/13/2016 | | 9/13/2016 | | FAIL |
Cody Riddle
|
|
|
Fail: Design Review approval was required prior to submittal of any construction permits.
|
Routing - PUBLIC WORKS | 9/1/2016 | | 9/13/2016 | | FAIL |
Rachael Beierle
|
|
|
See BGM in Drainage.
|
Routing PW Drainage | 9/2/2016 | | 9/13/2016 | | FAIL |
Brian McGowan
|
|
|
ROOF RUNOFF2 FEET P. LINE GRADING,SIW FORM O AND M FAILURE SYSTEM,5 YEARS KEEP RECORDSSOURCE CONTROLS
|
Routing PW Street Lights | 9/1/2016 | | 9/2/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLANNING Land Div | 8/31/2016 | | 9/1/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 9/1/2016 | | 9/1/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/31/2016 | | DONE |
|
|
|
|
Intake Approval | | | 8/31/2016 | | PASS |
|
|
|
as per Brian Murphy
|
Recd Pcfee & Taken To Pln CK | | | 8/31/2016 | | DONE |
|
|
|
|
Application received | | 8/26/2016 | | | |
|
|
|
|